Signal Box closure dates

Discussion in 'Infrastructure & Stations' started by sdd, 19 May 2015.

Thread Status:
Not open for further replies.
  1. sdd

    sdd Member

    Messages:
    6
    Joined:
    25 Apr 2015
    Can anybody point me to an official list of expected closure dates for various signal boxes? I thought I'd seen something on the net, but I can't find it now.

    Thanks.
     
  2. CallySleeper

    CallySleeper Established Member

    Messages:
    1,662
    Joined:
    27 Jun 2006
    Location:
    trentbartonland
  3. Rail Ranger

    Rail Ranger Member

    Messages:
    185
    Joined:
    20 Feb 2014
    That list is completely out of date. Many resignalling schemes are running seriously late for a number of reasons including a nationwide shortage of signal testers and seriously increased costs.
     
  4. Freightmaster

    Freightmaster Established Member

    Messages:
    1,512
    Joined:
    7 Jul 2009
    As per the post above, due to major changes/slippages,
    all the lists published on various websites and magazines
    in the past year or so, official or otherwise, are now woefully
    inaccurate/misleading.

    As I am responsible for updating the Railcam signalling diagrams,
    I'd love an updated/accurate list of resignalling dates myself! :)

    I know that Derby PSB is currently being decommissioned
    (the Burton/Wichnor area panel moved to the EMCC earlier this month),
    and the two boxes at Stafford will be abolished sometime between
    September and Christmas, but beyond that, I'm not certain.


    Are you interested in a particular box/route??



    MARK
     
  5. robert7111a

    robert7111a Established Member

    Messages:
    1,396
    Joined:
    24 Apr 2014
    Location:
    PTSO or platform depending on the weather
    I would be interested in Lancing, Arundel, Littlehampton and Bognor Regis please

    And Newhaven boxes which were originally slated for this year - not sure about Lewes though...
     
  6. NSEFAN

    NSEFAN Established Member

    Messages:
    2,827
    Joined:
    17 Jun 2007
    Location:
    Southampton
    According to the Section C page on thesignalbox website, Bognor is due to go in 2018 and Lancing, Arundel, Littlehampton in 2016. Lewes is supposedly being done at the same time as Newhaven.

    Of course, this plan seems to get pushed back several times a year. Pevensey - Bexhill was supposed to have been done in 2013! Around those parts, I still need to photograph Arundel, Polegate (I think it's preserved) and Plumpton crossing box.
     
    Last edited: 19 May 2015
  7. pdeaves

    pdeaves Member

    Messages:
    863
    Joined:
    14 Sep 2014
    Location:
    Gateway to the South West
  8. collexions

    collexions Member

    Messages:
    34
    Joined:
    18 Jan 2010
    Location:
    Bradford-on-Avon
    Not sure about signal box closures, but do have some proposed workstation commissioning dates:

    Three Bridge ROC / Sussex Route

    2016.01 (London Bridge 'Inner') Charing Cross workstation (TMS/WestCad Interfaced)

    2016.05 (Victoria II) Streatham workstation (WestCad conventional, No ARS)

    2016.08 (London Bridge 'Inner') Cannon Street workstation (TMS/WestCad Interfaced)

    2018.02 (London Bridge 'Outer') Lewisham workstation (TMS/WestCad Interfaced)

    2018.05 (London Bridge 'Outer') Grove Park workstation (TMS/WestCad Interfaced)

    2018.Q2 (Thameslink 'Core') Core South/Central/South workstation (TMS/WestCad Interfaced - configurable to 1,2,3 dispatchers)

    York ROC / LNE Route

    2015.12 North Lincs workstation (Ph.1) (WestCad conventional with ARS+)

    2016.?? Sheffield & Rotherham workstations (WestCad conventional with ARS+)

    2017.08 Trans-Pennine (Ph.1) workstation (TMS Interfaced/Integrated)
    (Re-control of Huddersfield SB, Healey Mills SB, Hebden Bridge SB & Milner Royd SB)

    2017.12 York IECC & Harrogate IECC workstations (TMS Interfaced/Integrated)
    (Re-control of all York & Harrogate IECC workstations)

    2018.08 Trans-Pennine (Ph.2) workstation (TMS Interfaced/Integrated)
    (Re-control of Mill Lane SB, Halifax SB & Batley SB)

    ...also got some CP5 proposed commissioning dates for a few other ROCs if anyone's interested? All subject to change of course!
     
  9. louis97

    louis97 Established Member

    Messages:
    1,185
    Joined:
    14 May 2008
    Location:
    Derby
    Has not moved just yet, it is still gradually being commissioned - this weekend involved some overnight commissioning. Final commissioning is due sometime over the next few months I think, although it may have slipped.
     
  10. sdd

    sdd Member

    Messages:
    6
    Joined:
    25 Apr 2015
    Yes - Beeston Castle & Chester, plus any near Llandudno.
     
  11. kimflop

    kimflop Member

    Messages:
    368
    Joined:
    21 Mar 2012
    Location:
    England
    2017 for Transpennine!? Not likely, especially seen as TM has largely been scaled back or cancelled.
     
  12. collexions

    collexions Member

    Messages:
    34
    Joined:
    18 Jan 2010
    Location:
    Bradford-on-Avon
    Likely...

    As someone whose been involved with NR and the TM suppliers for the past three years, and is heavily involved in the 'de-scoped' Subsequent Deployment, I can confirm those schemes & dates are correct as of now.

    All the Sussex & LNE schemes cited are the 'optional' components of the de-scoped deployment (Thameslink Core being the primary/mandatory element), and I can confirm that all three TM suppliers are bidding for these optional components. Award is in July. Underway by August.
     
  13. Freightmaster

    Freightmaster Established Member

    Messages:
    1,512
    Joined:
    7 Jul 2009
    Sorry. Yes, just the Burton part of the west panel area (certainly
    the Clay Mills Goods lines, as the old Derby PSB train describers
    on the Goods Lines changed to displaying a '1969-2015' farewell
    message similar to what happened when Wolverhampton PSB
    was decommissioned a few days earlier).


    I think the North Wales Coast has slipped to November 2017 now
    (was to have been this year!). Beeston Castle and Crewe steelworks
    were also supposed to be this year, but I think they have also been
    put back in order to prioritise Gresty Lane, because of the condition
    of the latter.

    All very fluid, I'm afraid! :?


    MARK
     
  14. thebigcheese

    thebigcheese Member

    Messages:
    140
    Joined:
    2 Jan 2012
    Anyone got a date for East Farleigh on the Medway Valley line?
     
  15. swills

    swills Member

    Messages:
    480
    Joined:
    15 Jan 2008
    Apart from those already going through the final stages, I think you will find that most of the rest are now many years away, if not tens of years away, and those that do come on stream will be conventional signalling and no TM, even ETRMS is in doubt (at least on multiple lines)
     
  16. robert7111a

    robert7111a Established Member

    Messages:
    1,396
    Joined:
    24 Apr 2014
    Location:
    PTSO or platform depending on the weather
    Not sure about Polegate Crossing now because I have heard NR doesn't want it preserved on its present site, due to it leaning over (the fact that they were quite happy to have their own staff work in it all these years...)

    And yes, I forgot about Plumpton...
     
  17. sdd

    sdd Member

    Messages:
    6
    Joined:
    25 Apr 2015
    I was speaking to some senior staff at Network Rail and was given to understand that Beeston Castle and area, plus North Wales is now scheduled to close in 2024.
     
  18. The Planner

    The Planner Established Member

    Messages:
    7,775
    Joined:
    15 Apr 2008
    Really? Beeston Castle is linked in with Crewe works so Im doubtful they have pushed that to the end of CP6 as it was due in the next year or so.
     
  19. LNW-GW Joint

    LNW-GW Joint Established Member

    Messages:
    10,161
    Joined:
    22 Feb 2011
    Location:
    Mold, Clwyd
    Be nice to see the back of the long block from Crewe Steel Works to Beeston Castle.
    It can be very awkward at times, usually leaving Crewe on a late VT, the ATW having been let go just in front of it...
     
    Last edited: 21 May 2015
  20. Yabbadabba

    Yabbadabba Member

    Messages:
    385
    Joined:
    23 May 2014
    I was In a staff reps meeting at TBROC yesterday (21/05/15) and those above planned dates were confirmed by one of the managers attending.
     
  21. collexions

    collexions Member

    Messages:
    34
    Joined:
    18 Jan 2010
    Location:
    Bradford-on-Avon
    Thanks for confirming from ROC / route level.
    Depending upon which supplier is selected I hope to have significant involvement in Thameslink TM deployment.

    Did you happen to get a date for Victoria II, Stage 2: Sutton-Wimbledon-Mitcham? Dec 2016/Easter 2017 possibly? Thx.

     
  22. Yabbadabba

    Yabbadabba Member

    Messages:
    385
    Joined:
    23 May 2014
    Nothing was said about it at this time but there were broad discussions on the floor plan beyond the Thameslink POD. Would just like add that I wasn't there to discuss ROC issues but that's we we hold our meetings and took an opportunity to talk to those in the know who also attend our meetings.
     
    Last edited: 22 May 2015
  23. andyb2706

    andyb2706 Member

    Messages:
    744
    Joined:
    21 Jan 2013
    Location:
    Manchester
    To be honest I wouldn't rely on any list out there, the box closures are totally fluid. On the section C website it shows Manchester North SCC close in 2019......it closed this easter. So boxes are either constantly being moved forward or backwards.
     
  24. SIGGY56

    SIGGY56 Member

    Messages:
    32
    Joined:
    27 Apr 2012
    The latest list, although some will no doubt change again:-x
     

    Attached Files:

  25. SIGGY56

    SIGGY56 Member

    Messages:
    32
    Joined:
    27 Apr 2012
    The latest date for the North Wales Phase 1 resignalling is now November 2017. Phase 2 west of Llandudno Junction now 2021 !:)
     
  26. mr_towers

    mr_towers Member

    Messages:
    20
    Joined:
    22 Jan 2013
    Location:
    Pitlochry
    Good list, much appreciated (though a lot of resignalling/recontrol due round here - allegedly by next year! We'll see). Thank you!
     
  27. swills

    swills Member

    Messages:
    480
    Joined:
    15 Jan 2008
    That list is now defunct, and (at least Anglia) all the dates have been pushed back by 5 years minimum, and even then subject to re-evaluation
     
  28. DaveHarries

    DaveHarries Established Member

    Messages:
    1,359
    Joined:
    12 Dec 2011
    Location:
    England
    Back in February this year I photographed Berwick, Bexhill, Polegate, Pevensey & Westham, Eastbourne and Hampden Park but was on a daytrip (from Bristol - was I mad? LOL) and so found no time to do Bo-Peep Junction and Plumpton GB but I still intend on doing those two, along with Lewes and Hastings.

    I believe Plumpton GB is down for later this year. Is this still the case? And what about the boxes at Bognor, BPJ, Lewes & Hastings?

    Dave
     
  29. carriageline

    carriageline Established Member

    Messages:
    1,697
    Joined:
    11 Jan 2012

    What floor plans were they discussing mate? Out of curiosity!
     
  30. robert7111a

    robert7111a Established Member

    Messages:
    1,396
    Joined:
    24 Apr 2014
    Location:
    PTSO or platform depending on the weather
    I think you'll be ok for this year and BPJ and Hastings will be around for some time to come. I wonder if these boxes (along with Robertsbridge) will eventually move control to Ashford IECC (or will Ashford migrate to EK at Gillingham)?
     