Islineclear3_1
Established Member
So yesterday I was at a station where a service train was inadvertently signalled into a platform that was occupied by a train. The driver took the train into the platform and realised that there wasn't enough room. All the passengers were told to alight from the first and second carriage. The third and fourth carriage of the train was off the platform and the starting signal is located at the end of the platform
I won't say the location as I don't want to incriminate anyone. The passengers were told there would be a slight delay to services due to a signalling error and all was back to normal within 15-20 minutes
I won't say the location as I don't want to incriminate anyone. The passengers were told there would be a slight delay to services due to a signalling error and all was back to normal within 15-20 minutes