Everyone knows the issues with Thameslink, and last night, Waterloo suffered similar problems. Almost every day we hear of trains delayed by "signalling Problems" and/or cable thefts, so isn't it time to stop laying huge lines of cables and start installing remote systems instead?
Does in-cab signalling still require miles of copper wire along the tracks? Is ETCS meant to go some way to eradicate this?
I am just curious because the amount of signalling related delays on the network is frankly appalling. Something which is not seen on HS1 (in cab signalling)
cheers
D
Does in-cab signalling still require miles of copper wire along the tracks? Is ETCS meant to go some way to eradicate this?
I am just curious because the amount of signalling related delays on the network is frankly appalling. Something which is not seen on HS1 (in cab signalling)
cheers
D