Does that mean that they already have enough 150's to run a Pacer-free service, but are still using the 143's while they can?
Or is there going to be a reduction in services or train lengths in the next timetable? (I'd have thought if anything we'd be needing more as travel picks up again)
There isnt a reduction in service. Presumably the plan is use the 769s more to do an internal cascade to free up more 150s to pair them but certainly from what ive seen internally the plan is to be a pacer free fleet from Saturday.
Todays diagrams are the 3 reported by
@superalbs plus
143606 on diagram 104
143607 today did the ecs to Swansea to work the 07:08 Swansea to Cardiff
143609 vice 150 on:
9:44 Aberdare to Barry Island
11:24 Barry Island to Merthyr
13:06 Merthyr to Barry I
14:43 Barry I to Treherbert
16:27 Treherbert to Bridgend
18:38 Bridgend to Aberdare