Failed Unit
Established Member
In case people havent noticed today is 1st November.
A long time after GTR got the timetable from Network Rail which they constantly tell people is the only reason the service collapsed.
At WGC you could think it was 1st June.
0652 cancelled- train failure (can’t be true 700s can’t fail)
0752 Cancelled - no crew
0832 Cancelled (was 0652)
0822 Cancelled - no Crew.
GTR think the current level of service is acceptable and are saying how wonderful they are. I beg to differ. How long can the peddle the this is all network rails fail like and when will the start accepting the are incapable of running this management contract?
A long time after GTR got the timetable from Network Rail which they constantly tell people is the only reason the service collapsed.
At WGC you could think it was 1st June.
0652 cancelled- train failure (can’t be true 700s can’t fail)
0752 Cancelled - no crew
0832 Cancelled (was 0652)
0822 Cancelled - no Crew.
GTR think the current level of service is acceptable and are saying how wonderful they are. I beg to differ. How long can the peddle the this is all network rails fail like and when will the start accepting the are incapable of running this management contract?
Last edited: