T
Tom
Guest
London Underground has finally come around to introducing the Connect project to the SSL.
An extra aerial can now be seen on the front of A stock trains (Connect radio aerial), the panels are installed, but are panelled over until the infrastructure is upgraded. As with the C69/77's, these have the aerials, but not all have the panelling.
Watch this space!
An extra aerial can now be seen on the front of A stock trains (Connect radio aerial), the panels are installed, but are panelled over until the infrastructure is upgraded. As with the C69/77's, these have the aerials, but not all have the panelling.
Watch this space!