There has been quite a lot of activity along the Maesteg line in recent weeks.
The track into Maesteg Station has been relaid with concrete sleepers and the buffer stop fixed into place, for years it has just sat in the ballast unconnected to the running line. Why concrete sleepers when the rest of the line is, or soon will be, on steel sleepers? In addition, the station site has been cleared of trees and bushes and covered with a layer of ballast. I suppose that it might make a useful place to store materials when electrification works start.
Steel sleepers have been laid out alongside the line from Tondu all the way to Llynfi Jc at Bridgend. The loop, however, looks as if it will remain untouched. A variety of track laying machinery and flood lights is to be seen in the yard at Tondu.