• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Transport for Wales 769's

Status
Not open for further replies.

Optom1

Member
Joined
20 Sep 2019
Messages
95
Location
Cardiff
Did the769 run the2F10 to Rhmney to Cardiff this morning? I wasnt watching rail cams this morning.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Brissle Girl

Established Member
Joined
17 Jul 2018
Messages
2,658
Post revised to reflect 769 rather than 230 usage - thanks gazthomas!

It certainly has. It took just 38 minutes from Pontlottyn and Cardiff Central, gaining 40 minutes! That said, it omitted at least eleven stops.

The top speed of a 769 is 90mph, but the ruling speed on the Rhymney branch (where most of the station stops are) is generally 75mph. This is equivalent to around 33.5 metres per second.

Let's allow around 23 seconds for the additional time to cover the distance from where braking commenced to the station stop itself. This reflects braking from 75mph at 0.75 metre per second per second (emergency braking is around 1.5 m/s/s). Note this is the additional time taken to cover the distance from where braking commenced to the station stop - not the total time it takes to cover that distance (I've calculated it by assuming constant deceleration, and halving the average speed over the braking distance, and subtracted the time taken to cover the braking distance at full speed from the time to cover the braking distance while braking to a standstill).

And it's reasonable to allow another 30+ seconds for the additional time required to reach 75 mph from each station stop. This assumes acceleration at 0.55 m/s/s - which is the rate at which 150s accelerate (although according to Porterbrook, the 769s will be faster accelerating than 150s). Again, please note that this is the additional time taken to cover the distance from the station stop to the point where top speed is reached - not the total time it takes to cover that distance (I've calculated it by assuming constant acceleration, and halving the average speed over the acceleration distance, and subtracted the time taken to cover the acceleration distance at full speed from the time to cover the acceleration distance while accelerating to top speed).

If we assume an average station dwell time of just over a minute (which is generous, given that according to RTT, many are scheduled to sop for only half a minute), that still means each station stop requires around an additional 2 minutes: 23 seconds lost braking from 75 mph, 1 minute to stand in the platform, and 30+ seconds lost while accelerating back to 75 mph. The reality, I suspect, is that the average station stop from top speed of 75 mph stop costs around an additional 90 seconds, and possibly a little less, over the time taken to cover the distance from where braking commences for the stop to the point where 75 mph is achieved again.

So had the 769 stopped at the 11 skipped stations this would have taken an additional 22 minutes (using 2 minutes per stop). As the 769 gained 40 minutes on its scheduled run, this means that it shaved at least 18 minutes off the journey time from Pontlottyn and Cardiff Central. And taking what I consider to be the more realistic figure of 90 seconds additional time per stop, this shows a time saving of an just over 23 minutes. Quite a feat.

But, pausing for a reality check, how long does a service train usually take to get from Pontlottyn and Cardiff Central? From RTT, 2P31, an off-peak train is scheduled to leave Pontlottyn at 10.13 (WTT), and to arrive at Cardiff Central at 11.09 (WTT), a journey time of 56 minutes. The 769 did it in 38 minutes, but skipped eleven stops. Adding back in the time for the station stops (using the same numbers as used above), would increase the journey time to 60 minutes (using generous numbers for the cost of each stop) or to 54 mins (using what I consider to be more realistic numbers).

So the big hurrah for the 769 seems to fall a little flat, in that the scheduled time for its return journey was somewhat leisurely. Yes, it gained a considerable amount of time, but on a fairly well padded schedule - NR anticipating some challenges along the way?

So on the face of it, it seems to me that switching to 769 usage will have little impact on journey times. That said, there are a host of other variables involved - not least driving techniques (loss powerful breaking / acceleration will increase the additional time required for each station stop), and realistic dwell times. Time will tell.
I think you're overthinking this somewhat.

Firstly, the padded scheduled timing is irrelevant. There would have been reasons why the padding was in there, and I'm guessing it wasn't needed.

As to the comparison with the normal time, you say it took 38 mins against a typical journey time of 56 mins. So an 18 min saving with 11 stops skipped. So around 90 secs a stop, which feels about right. Don't forget not all missed stops can be taken at a full 60 or 75mph line speed. That's all there is to it really. I'm sure the driver wasn't driving flat out either, but probably driving cautiously getting used to new unfamiliar rolling stock.
 

Optom1

Member
Joined
20 Sep 2019
Messages
95
Location
Cardiff
Being a bit bored during wet weather did a few trips with 170’s(some of which have rear cab only door opening):pacers:150,s:class37 locohauled stock.Outside of Central/Queen St most dwell times were40-50 secs.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
14,268
Location
St Albans
So AM9, how do you get from 750V DC to the 1500V DC required for the traction motors, 240V AC for the house supply and 110V DC for other bits?
I did say that I wasn't an expert in the electrics side of things....
As samuelmorris has posted, the motors are 750VDC types, (like most BR MKI & III EMUs) the 319s are actually GEC but they are derivatives/alternatives to the classic Southern Electrics' English Electric EE507 type. Unlike camshaft traction control systems, I think that the motors are each fed by and are separately controlled by the GTO electronics, so they aren't put into series configuration for starting then switched to parallel for higher speeds and cruising. Other than higher (loco sized) motors, I think that 1500VDC motors on EMUs are relatively rare as there can be insulation problems when the peak voltages rise much above 1kV. The class 306 & 307 EMUs were originally 1500VDC designs (like the 506s on the Manchester, Glossop and Hyde line), and to reduce energy waste, the motors were 750VDC types but wired in series per bogie and the two bogies in series/parallel, starting in series and changing over to parallel st around 20mph, (often with much clacking and banging of contactors). When converted to ac, they were given a 1500VDC, fed from a 1500Vac tranformer and rectifier to enable the existing DC traction control to continue in use.
The 110 and 240V 'hotel'' supples were derived from auxiliary motor-generator sets.
 

anamyd

On Moderation
Joined
17 Aug 2018
Messages
3,011
Top speed of a 769 is 100mph apparently
the 100mph top speed is on overhead electrification as in working like a 319; on Diesel the top speed is reduced in a similar way to 800s in that it's "as fast as the power generated for the motors by the engines will allow" - the Diesel top speed of a 769 is said to be "approximately 87mph".
 
Joined
21 Aug 2019
Messages
62
Location
Newport
the 100mph top speed is on overhead electrification as in working like a 319; on Diesel the top speed is reduced in a similar way to 800s in that it's "as fast as the power generated for the motors by the engines will allow" - the Diesel top speed of a 769 is said to be "approximately 87mph".
Ah, ok. Still, it's better than a 150.
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,355
the 100mph top speed is on overhead electrification as in working like a 319; on Diesel the top speed is reduced in a similar way to 800s in that it's "as fast as the power generated for the motors by the engines will allow" - the Diesel top speed of a 769 is said to be "approximately 87mph".

Source?

The 800s top speed on Diesel is 125, and they can achieve that; same as on Electric.
 

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
Source?

The 800s top speed on Diesel is 125, and they can achieve that; same as on Electric.
There were suggestions that 800s topped out at 118mph on level ground but that was probably before the 800s were reprogrammed to behave the same way as 802s. I've seen the 87mph figure for 769s a few times. Given the 319s are known for accelerating very slowly beyond 90mph, I can believe it.
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,355
There were suggestions that 800s topped out at 118mph on level ground but that was probably before the 800s were reprogrammed to behave the same way as 802s. I've seen the 87mph figure for 769s a few times. Given the 319s are known for accelerating very slowly beyond 90mph, I can believe it.

I too can believe it. But the QP put it in quotation marks while correcting another poster and thus portrayed the matter as fact. It’s not, it’s hearsay; just as the 118mph Diesel top speed for IETs was incorrect hearsay.
 

Nymanic

Member
Joined
6 Jan 2014
Messages
146
Location
Manchester
I too can believe it. But the QP put it in quotation marks while correcting another poster and thus portrayed the matter as fact. It’s not, it’s hearsay; just as the 118mph Diesel top speed for IETs was incorrect hearsay.

While not proven fact, the 87mph figure does come from Porterbrook's own modelling data (source). The real-world figure appears yet to be divulged.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
67,830
Location
Yorkshire
Just a gentle reminder this thread is to discuss Transport for Wales 769's

We do welcome the discussion of other trains, e.g class 80x, but we do ask that these are posted in a seperate thread please.
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,351
Unless they start working on the main line they won't get anywhere near 87mph.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
14,268
Location
St Albans
Unless they start working on the main line they won't get anywhere near 87mph.
On level track, the ultimate* maximum speed would be the same as they were as 319s less a small amount for lower power to overcome rolling resistance and aerodynamics. Thus 87mph on diesel isn't far out considering the 319s (and 769s on 25kV) would likely be somewhere in the 90s, in line with that during 25 years of Thameslink service.
* ultimate in terms of the asymptote on an unlimited length level track.
 
Last edited:

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,351
On level track, the ultimate* maximum speed would be the same as they were as 319s less a small amount for lower power to overcome rolling resistance and aerodynamics. Thus 87mph on diesel isn't far out considering the 319s (and 769s on diesel) would likely be somewhere in the 90s, in line with that during 25 years of Thameslink service.
* ultimate in terms of the asymptote on an unlimited length level track.

I was thinking about the line speeds between Penarth and Rhymney rather than the capabilities of the units.
 

Cardiff123

Established Member
Joined
10 Mar 2013
Messages
1,318
Anyone want to make a prediction of whether we will see even one 769 in passenger service by the May TT change? Seeing as training runs only lasted a few days before they were stopped, and due to the current coronavirus situation, I'm going to guess it'll now be late summer or early autumn before any 769s are in passenger service.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
97,879
Location
"Marston Vale mafia"
Anyone want to make a prediction of whether we will see even one 769 in passenger service by the May TT change? Seeing as training runs only lasted a few days before they were stopped, and due to the current coronavirus situation, I'm going to guess it'll now be late summer or early autumn before any 769s are in passenger service.

On the basis that the reduced service doesn't need them and the social distance measures are likely to go on for some time, I suspect no we won't.
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
5,242
On the basis that the reduced service doesn't need them and the social distance measures are likely to go on for some time, I suspect no we won't.

Maybe just one to say that TfW meet the deadline and, because it's 4-car, at least it can't be short-formed?
 

Brissle Girl

Established Member
Joined
17 Jul 2018
Messages
2,658
Maybe just one to say that TfW meet the deadline and, because it's 4-car, at least it can't be short-formed?
I suspect meeting deadlines for introduction of trains is pretty low down anyone’s priorities at the moment. Don’t think anyone is going to be breathing down their neck to ensure it’s done in time.
 

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,079
Location
wales
I suspect meeting deadlines for introduction of trains is pretty low down anyone’s priorities at the moment. Don’t think anyone is going to be breathing down their neck to ensure it’s done in time.
I have to agree with the virus it's likely things won't be particularly busy for a while
 

Chris217

Member
Joined
7 Nov 2018
Messages
620
I suspect meeting deadlines for introduction of trains is pretty low down anyone’s priorities at the moment. Don’t think anyone is going to be breathing down their neck to ensure it’s done in time.

Also,government relaxation of all rail franchise agreements due to covid-19
pandemic.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,081
Amongst other restrictions brought in to cope with this crisis, at present no more then one person is permitted in either cab of a train at any time, except for emergencies obviously. It is therefore impossible to carry out any kind of training, since the instructors aren't allowed to have trainees with them. All trainee drivers and conductors are working from home, and I doubt you'll see any qualified train crew learning new traction any time soon.
 
Status
Not open for further replies.

Top