I saw this Thursday afternoon at Eastleigh works and was curious if they are nearly done the checks and repairs. If anyone knows about them
All I know is it’s the whole fleet being done, so not just LNER, I’ve seen GWR units there as well; and was expected to be an overall six year programme when announced in 2022. I did read somewhere that some individual trains were taking many months to do, it would be interesting to know what the intended cycle time is for 5 and 9 car units; and how man6 are in hand at the same time.I saw this Thursday afternoon at Eastleigh works and was curious if they are nearly done the checks and repairs. If anyone knows about them
Hitachi are doing the work according to the original press releases about the project. I think like many previous long running contracts (such as Siemens doing the SWT Desiros), Arlington effectively just rent out the shed space.Thankyou , just was curious on the finishing dates etc and who’s the contract with as I know a lot companies use Eastleigh for repairs , maintenance and storage
Big name then , and that’s fair enough they’ve got the space there for themHitachi are doing the work according to the original press releases about the project. I think like many previous long running contracts (such as the SWT Desiros), Arlington effectively just rent out the shed space.
Hitachi are doing the work according to the original press releases about the project. I think like many previous long running contracts (such as Siemens doing the SWT Desiros), Arlington effectively just rent out the shed space.
It was rather hush hush and no photos (not even for own purposes) were aloud to be taken. The guides didn’t really have any info either to divulge only to say as per above Hitachi rent the workshop space and their own staff with their own kit do the works.
Arlington staff dont get involved from my understanding.
So really they are like you said hush hush , not wanting people to know too much of what’s going onAs per a tour around Eastleigh works last weekend Hitachi have Bay 2 Notth and South with a goods inward bay. At the back end.
There was a GWR one inside and LNER outside.
Impression was that GWR One was near completion and LNER had been started but not taken inside yet.
It was rather hush hush and no photos (not even for own purposes) were aloud to be taken. The guides didn’t really have any info either to divulge only to say as per above Hitachi rent the workshop space and their own staff with their own kit do the works.
Arlington staff dont get involved from my understanding.