General Zod
Member
- Joined
- 5 Jan 2008
- Messages
- 565
It has been quoted on the National Rail Enquiries page that reservations are closed from 24 July to 4 August as a result of engineering work in the Warrington area. Does this also mean that no Adavnces will be issued between stations on this stretch of line or that the actual timing of the Advance release will be slightly later than usual ?