'Over 60 tph' is the whole station number of arrivals across all 3 service groups, not just the Windsor lines, despite how they report it in the video. Capacity on the Windosr side after the changes is only increased to 20 tph.
There are no plans to reinstate four tracking, or demolish the flyover. If anything they intend to run the Windsor side service on only two tracks, as described in the Route Study. I attached the proposed track layout drawing in post #26 a few weeks ago.
There's a short summary of the four main parts of the Waterloo Capacity Improvement Project WCIP in the planning application:
I see Grade separation at Woking mentioned - I thought grade separation Basingstoke was also needed though?