The big blocks will be so weekends are hardly used.Siting masts on the twisty Windermere branch would be quite a design challenge, and I'm sure is out of scope.
The WCML rewiring will probably use high-output equipment as they did for WCRM.
The challenge there will be to rewire the maximum length in (weekend?) possessions to avoid weekday disruption on the line.
I expect it follows on from similar life-expired rewiring on the GEML, which was considerably more complex (mostly 4-track with many crossings).
At least they won't have to deal with LNER-era hardware.
== Doublepost prevention - post automatically merged: ==
They will. Its effectively a free block for them.One would hope they will be rewiring near Penrith (South of M6 Junction 40) during the M6 Bridge Renewal next January.