43021HST
Established Member
Ok so I've started making the Alton to Woking line for Trainz, but I'm wondering what period would be more popular as I've been thinking of setting it either 15 years ago in the twilight of southern slammer operation, or making it present day with 450s operating.
What does RUK think anyway?
Please note the 450s are more difficult to create due to the lack of technical drawings readily available, drawings for 4VEPs and CEPs are far easier to get hold of and I've already started the DTS of a Class 423.
What does RUK think anyway?
Please note the 450s are more difficult to create due to the lack of technical drawings readily available, drawings for 4VEPs and CEPs are far easier to get hold of and I've already started the DTS of a Class 423.