Why so many delays on the WCML every day?

pnepaul

Member
Joined
11 Sep 2012
Messages
147
Location
Carlisle
For those interested: as I type this - 23.50, only platform 1 available. Meanwhile, 4 heavily delayed southbound trains 1M19 ( 18.40 Glasgow - Euston) 9M62 ( 1852 Edinburgh - Euston) 1N25 ( Carlisle to Preston) and 1M20 ( 20.05 Glasgow to Crewe) are stuck outside Preston. As for 9S97 (17.43 Euston to Glasgow) and 1S98 (19.30 Euston to Glasgow ) still waiting to go north...

Typical, as I type, 2 platforms became available lol.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,359
Had delays travelling on the 0652 Edinburgh- Crewe Pendolino on Tuesday.


Firstly, for some unknown reason the signaller let the 6K10 engineers train to Carlisle out right in front of us at Slateford!
Edinburgh-Carstairs is usually a very reliable line particularly since last year’s remodelling. Aside from occasional level crossing issues.
Either a train or infrastructure failure occurred in the Cobbinshaw area as things were on time at Slateford.
 
Last edited:

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,201
Location
London
Looks like good progress is being made ahead of monday on the damaged points near Bletchley:


GumpWkMWIAA3mnT
GunXRsFXYAACEQ5

West Coast Main Line:
Work to repair & replace damaged track equipment is progressing well
We’re testing everything ahead of reopening the affected lines through Bletchley - we expect this to be later today

At 18:12PM all lines are re-opened but the affected points remain locked till repairs to the points equipment can be done:
West Coast Main Line:
Update: All lines have now reopened at Bletchley Follow up repair work is being planned on points, which allow trains to move from one track to another
 
Last edited:

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
5,031
Location
Neilston, East Renfrewshire
Another day, yet more disruption. 4M27 0533 Coatbridge-Daventry failed between Kirtlebridge and Quintinshill, just assisted forward. 1M08 0736 Glasgow C-Euston 125 late from Carstairs, for some reason now behind 9M51 0800 Glasgow C-Euston. 1M08 shown terminating at Preston.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
5,031
Location
Neilston, East Renfrewshire
In the end 9M51 terminated at Preston and 1M08 ran through to Euston, arriving there 134 minutes late. The incident did show why, yet again, bidirectional signalling would save so much delay, as not many trains passed on the Down line while the Up was at a stand.

It was 66426 that failed on 4M27, assisted forward (quite efficiently, in the circumstances) by 57309.
 