For those interested: as I type this - 23.50, only platform 1 available. Meanwhile, 4 heavily delayed southbound trains 1M19 ( 18.40 Glasgow - Euston) 9M62 ( 1852 Edinburgh - Euston) 1N25 ( Carlisle to Preston) and 1M20 ( 20.05 Glasgow to Crewe) are stuck outside Preston. As for 9S97 (17.43 Euston to Glasgow) and 1S98 (19.30 Euston to Glasgow ) still waiting to go north...

Typical, as I type, 2 platforms became available lol.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,359
Had delays travelling on the 0652 Edinburgh- Crewe Pendolino on Tuesday.


Firstly, for some unknown reason the signaller let the 6K10 engineers train to Carlisle out right in front of us at Slateford!
Edinburgh-Carstairs is usually a very reliable line particularly since last year’s remodelling. Aside from occasional level crossing issues.
Either a train or infrastructure failure occurred in the Cobbinshaw area as things were on time at Slateford.
 
Last edited:

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,201
Location
London
Looks like good progress is being made ahead of monday on the damaged points near Bletchley:


GumpWkMWIAA3mnT
GunXRsFXYAACEQ5

West Coast Main Line:
Work to repair & replace damaged track equipment is progressing well
We’re testing everything ahead of reopening the affected lines through Bletchley - we expect this to be later today

At 18:12PM all lines are re-opened but the affected points remain locked till repairs to the points equipment can be done:
West Coast Main Line:
Update: All lines have now reopened at Bletchley Follow up repair work is being planned on points, which allow trains to move from one track to another
 
Last edited:

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
5,036
Location
Neilston, East Renfrewshire
Another day, yet more disruption. 4M27 0533 Coatbridge-Daventry failed between Kirtlebridge and Quintinshill, just assisted forward. 1M08 0736 Glasgow C-Euston 125 late from Carstairs, for some reason now behind 9M51 0800 Glasgow C-Euston. 1M08 shown terminating at Preston.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
5,036
Location
Neilston, East Renfrewshire
In the end 9M51 terminated at Preston and 1M08 ran through to Euston, arriving there 134 minutes late. The incident did show why, yet again, bidirectional signalling would save so much delay, as not many trains passed on the Down line while the Up was at a stand.

It was 66426 that failed on 4M27, assisted forward (quite efficiently, in the circumstances) by 57309.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
5,036
Location
Neilston, East Renfrewshire
Another day, another shambles on the WCML. Today, 4S50 0605 Basford Hall=Coatbridge FLT is in trouble between Beat tock Summit and Abington. Northbound passenger trains being held back as far south as Warrington.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
17,159
Location
Glasgow
Another day, another shambles on the WCML. Today, 4S50 0605 Basford Hall=Coatbridge FLT is in trouble between Beat tock Summit and Abington. Northbound passenger trains being held back as far south as Warrington.
Broken coupling rather than a loco failure I understand, which makes a change!
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
17,159
Location
Glasgow
I am curious as to why nothing is going south as the line Up main is clear at the moment.
0M51 is going to haul the other half of the stricken train south into Beattock loop to clear the line AIUI, so presumably keeping the southbound clear to facilitate that?
 

pnepaul

Member
Joined
11 Sep 2012
Messages
149
Location
Carlisle
0M51 is going to haul the other half of the stricken train south into Beattock loop to clear the line AIUI, so presumably keeping the southbound clear to facilitate that?
I think it's on the move, just passed Lammington - northbound passenger trains getting going as well.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
17,159
Location
Glasgow
I think it's on the move, just passed Lammington - northbound passenger trains getting going as well.
Indeed, though it seems 1Z50 (the recovered part of 4S50) is heading south towards Carlisle rather than only to the nearest loops.

The front part of 4S50 does seem to just be proceeding otherwise as normal just very late.
 

Class15

Established Member
Joined
30 Dec 2021
Messages
3,330
Location
North London or Mildmay line
Indeed, though it seems 1Z50 (the recovered part of 4S50) is heading south towards Carlisle rather than only to the nearest loops.

The front part of 4S50 does seem to just be proceeding otherwise as normal just very late.
Just seen 4S50 on the Railcam Thankerton camera, there were only a few wagons behind the pair of 90s. Maybe 3 or 4.
 