BS56
Member
- Joined
- 6 Jan 2019
- Messages
- 124
Moderator note: split from https://www.railforums.co.uk/threads/windermere-line-electrification-progress.191705/#post-4192064
Will increasing line capacity mean putting in a passing loop somewhere along the line say Burnside ?
Will increasing line capacity mean putting in a passing loop somewhere along the line say Burnside ?
Last edited by a moderator: