D365
Veteran Member
- Joined
- 29 Jun 2012
- Messages
- 11,498
I thought the acceleration cap was mainly due to poor(er?) track conditions in the tunnels? I'm not really too sure! Presumably all that's been (being?) sorted out so that the maximum capacity enhancement can be had from ATO - until such a time where the line can be fully split.
Last edited: