cjohnson
Member
- Joined
- 3 Sep 2009
- Messages
- 602
Due to "large number of trains are requiring urgent repairs" according to NRE.
Is this something that has gone drastically wrong with the 360s overnight? Or is it a repeat of the previous 332 issue (where HEx found defects the 332s, so "borrowed" the 360s resulting in no units available to run the Connect service...)
Is this something that has gone drastically wrong with the 360s overnight? Or is it a repeat of the previous 332 issue (where HEx found defects the 332s, so "borrowed" the 360s resulting in no units available to run the Connect service...)