traindoorshut
Member
- Joined
- 25 Aug 2018
- Messages
- 19
Hi I'm new here, Hello! I've been using the Great Western mainline for years, and interested a little more in the electrification development of this line and lines connected to it.
I read about two years ago from a source I can no longer find, which maybe B.S. now, that journey times after the electrification, between Bristol Parkway and London Paddington could take 1hr 10mins. That is 12mins faster than the current fastest service at 1hr 22mins departing at 08:03 BPW arriving at 09:25 PAD. Have predicted timetables been released yet once the electrification is in full operation? If so, what is the source? If not, what are credible sources of information to follow or can anyone share any insights on journey times?
I read about two years ago from a source I can no longer find, which maybe B.S. now, that journey times after the electrification, between Bristol Parkway and London Paddington could take 1hr 10mins. That is 12mins faster than the current fastest service at 1hr 22mins departing at 08:03 BPW arriving at 09:25 PAD. Have predicted timetables been released yet once the electrification is in full operation? If so, what is the source? If not, what are credible sources of information to follow or can anyone share any insights on journey times?