Moderators note: split from https://www.railforums.co.uk/threads/financial-difficulty-at-northern.184079/page-2#post-4056413
To be fair to Northern (and I admit, we've had it a lot easier over here than out west), they have delivered some very useful timetable changes, such as later trains in particular, that have been long overdue. They've also attempted to deliver some which have been deliberately obstructed by Network Rail (later trains on Saturday).
To be fair to Northern (and I admit, we've had it a lot easier over here than out west), they have delivered some very useful timetable changes, such as later trains in particular, that have been long overdue. They've also attempted to deliver some which have been deliberately obstructed by Network Rail (later trains on Saturday).
Last edited by a moderator: