Mitchell Hurd
On Moderation
- Joined
- 28 Oct 2017
- Messages
- 1,648
Possibly use with Network Rail as 125mph test trains, would take the strain on the NMT HST set which at some point will become life expired, and could replace the 37/67 MK2 sets
Would take some conversion but given their passenger use is limited, it wouldn't be a stupid option and much better than scrap
Good one - better taking out at night time (say midnight?) then that way there's less disruption should it fail in service.