Just saw a 730 in Crewe carriage sidings with Liverpool Lime Street on the outdoor displays.
There's a slot booked for a possible test run tonight but not yet activated.

There's also a similar one tomorrow night with an additional return journey between LIV and LPY.
 

rogercov

Member
Joined
8 Feb 2019
Messages
194
Location
Coventry/London
Out of interest how often do they units swap from London side to the west midlands seems to be a daily Euston to Soho and return but each day this week is the same units there and back ?
Yes, I'm intrigued too. I thought it was for maintenance purposes but it only stays at Soho for around 20 minutes and then the same units go back to Euston (5G99 and 5A99). Today it was 730005 + 730011.
I see it stops at a few places for "staffing reasons". Perhaps it's a staff train. If so, how common are these?
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
16,265
Location
Epsom
Yes, I'm intrigued too. I thought it was for maintenance purposes but it only stays at Soho for around 20 minutes and then the same units go back to Euston (5G99 and 5A99). Today it was 730005 + 730011.
I see it stops at a few places for "staffing reasons". Perhaps it's a staff train. If so, how common are these?
Do they use the same run for stock swaps when they do swap units? A 20 minute turnaround time at Soho would seem to be long enough to allow one pair to enter and a different pair to leave?
 

rogercov

Member
Joined
8 Feb 2019
Messages
194
Location
Coventry/London
Do they use the same run for stock swaps when they do swap units? A 20 minute turnaround time at Soho would seem to be long enough to allow one pair to enter and a different pair to leave?
According to RTT it's usually the same pair on the return journey, but last Wednesday it looks like they swapped one of the two units.
 

800001

Established Member
Joined
24 Oct 2015
Messages
5,396
LNWR had a stakeholder launch today for the 730/2 which are introduced from Monday 9th June.
Interesting to see them refer to the train as having level boarding, am I missing something with this?

Built with accessibility in mind – featuring accessible toilets, level boarding, additional priority seating and open spaces, plus clear passenger information systems throughout.
Because everyone deserves a smooth, comfortable journey.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
104,700
Location
"Marston Vale mafia"
LNWR had a stakeholder launch today for the 730/2 which are introduced from Monday 9th June.
Interesting to see them refer to the train as having level boarding, am I missing something with this?

They are not level boarding. Like all Aventras (but not as bad as the CAFs) they appear to have a higher step than the 350s, indeed.
 

800001

Established Member
Joined
24 Oct 2015
Messages
5,396
They are not level boarding. Like all Aventras (but not as bad as the CAFs) they appear to have a higher step than the 350s, indeed.
Someone needs to tell LNWR that, especially the social media/marketing team, attached is a screen shot from there tweet stating level boarding
 

Attachments

  • IMG_3678.png
    IMG_3678.png
    2.1 MB · Views: 59

RealTrains07

Established Member
Joined
28 Feb 2019
Messages
1,834
Maybe they just looked at a list of buzzwords other TOCs have used for new trains... :E
Certainly does feel that way on their twitter and facebook as certain word choices are questionable.

Words like “greener” when they are replacing 36 modern electric trains with 36 modern electric trains? How are they more greener?

“faster” even though the 730 top speed is no better than a 350. (Yes 730s are faster than a 319 but thats not what LNR are trying to sell them against anymore)

It does come across that LNR really are trying to desperately sell this “new era” and provide a lot of fanfare which again in a nutshell (extra carriage, new seats and extra space aside) they are replacing a fleet of modern trains with another fleet of modern trains.

Compared to the 730/0s coming into service which had far less fanfare and yet the upgrade they brought compared to what they replaced was clear as day and significantly better.

Safe to say I’m not yet convinced. I do hope that these 730/2s are as LNR say a “new era”. Especially since the millions spent on them just to cascade away a different fleet of modern train.
 
Last edited:

tfw756rider

Member
Joined
30 Nov 2024
Messages
333
Location
Wales
"Faster" isn't true for at least the top speed of 730/2 vs. 350 (110mph vs. 110mph) but is true for 730/2 vs. "borrowed" 730/0 (110mph vs. 90mph).

Could the 730/2s have quicker acceleration than the 350s?

As for "greener", could the 730/2s have a lower current draw from the OverHead Line Equipment than the 350s?

"Level boarding" is just plain false though, how can they claim that?
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
1,953
They are not faster in terms of top speed, but they are considerably faster in acceleration than the 350s and door release is quicker too so they will be faster in terms of time. There may need to be a recast of timings at some point, or just leave plenty of slack to tighten up delays.

No idea why the Comms team have put out misleading information, they were never promised to be level boarding even back when the order was placed!

Internally we've been told to expect a new unit entering service every 2 weeks which seems fine for initial introduction. I'm more concerned that we're not expecting all the 730/2s to be in service until end of 2026!

Anyone know the rough timeframe the 730/0 or the 196s took from first to last?
 

tfw756rider

Member
Joined
30 Nov 2024
Messages
333
Location
Wales
They are not faster in terms of top speed, but they are considerably faster in acceleration than the 350s and door release is quicker too so they will be faster in terms of time. There may need to be a recast of timings at some point, or just leave plenty of slack to tighten up delays.

No idea why the Comms team have put out misleading information, they were never promised to be level boarding even back when the order was placed!

Internally we've been told to expect a new unit entering service every 2 weeks which seems fine for initial introduction. I'm more concerned that we're not expecting all the 730/2s to be in service until end of 2026!

Anyone know the rough timeframe the 730/0 or the 196s took from first to last?
Thanks :) Do you know anything about the "greener" bit? Anything to do with electricity draw, or?

The first 196 entered service on the 17/10/22 and the last 196 is believed by @RUK (on this page) to have entered service on the 28/9/24. That would be 26 units in [707 days] / [1 year, 11 months and 6 days] / [23 months and 6 days] / [101 weeks] (getting on for 2 years).
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
1,953
Thanks :) Do you know anything about the "greener" bit? Anything to do with electricity draw, or?

The first 196 entered service on the 17/10/22 and the last 196 is believed by @RUK (on this page) to have entered service on the 28/9/24. That would be 26 units in [707 days] / [1 year, 11 months and 6 days] / [23 months and 6 days] / [101 weeks] (getting on for 2 years).
No idea on the greener angle, I'll drop fleet a message maybe.

I guess the 196s was quite a poor launch with plenty of problems but that makes 18 months seem about right for these then.
 

AJDesiro

Member
Joined
10 May 2019
Messages
826
Location
Rugby
No idea on the greener angle, I'll drop fleet a message maybe.

I guess the 196s was quite a poor launch with plenty of problems but that makes 18 months seem about right for these then.
To be honest, the 196 launch was pretty much finished around mid-late 2023; 196113 and 196114 weren’t in service until late last year though, but all the services meant to be operated by 196s were mostly run by them for a while even without those two units (ironically, 172s are a common site on Hereford services at the moment!).

730/0 introduction took roughly a year, with just the one diagram on Walsall-Wolves (after WCML South launch) for quite a while until they were launched on the X City around 2 months later in April 2024. They didn’t make it to the Chase or other Walsall-Wolves diagrams until later in 2024 (October/November, ish…). So the 730/0s took around a year in total, which isn’t bad for 48 units on my opinion.
 