The outcome of this consultation is that Newhaven Marine station should close. However this proposal is subject to agreement by the Office of Rail and Road (‘ORR’). Should closure be agreed by ORR, the station will close either:
or
- on a date not be before 26 September 2020
depending on which date is later.
- four weeks after ratification by the ORR
A summary of the responses to the consultation is included in the outcome and was released on 24 June 2020.
The wheels of government turn as slowly as possible, with the handbrake fully applied. ORR get 3 months to rubber stamp this?Newhaven Marine rail station closure
Seeks views on proposals to close Newhaven Marine railway station.www.gov.uk
Interesting driver training moves on Monday, between Newhaven Marine and Day Aggregates,
Trains at Newhaven Marine Ag Tml Dbc on 27/07/2020 | Rail Record
Live Train Times for Newhaven Marine Ag Tml Dbc - Search passenger and freight services at Newhaven Marine Ag Tml Dbclive.rail-record.co.uk
I think it's just route learning for hither green drivers into marine who already know the route as far as town yardCould this be route learning etc in anticipation for train loads of “Bottom Ash“ from the Incinerator to the new concrete block manufacturing plant?...
You're looking for ground signal TLW1575 for down movements from the Up Seaford line into Newhaven Town Yard over TLW26 points. The signal and point numbers may have altered with the final recontrol of the area as the diagram I have referred to is over a year old.
In my view, this is the correct decision. There is no viable passenger traffic at Newhaven Marine which cannot be served by the other two stations in the town. Foot passengers for the ferry are now better served at Newhaven Town, which is closer to the entrance to the new ferry terminal building. The site of Newhaven Marine station will be much more productively used by aggregates traffic. Retaining the station would be analogous to the idea of retaining New Holland Pier station after the Humber Bridge opened and the ferries ceased - an absurd notion.
What I am oppose to however is the methodology of the closure. The closure proposals should have been made as soon as the boat trains ceased to run or at the very latest when the old ferry terminal was closed, I am unsure of the service history, they may well both have happened on the same date. That is when the service became pointless. By leaving it this long, years after the event, with the vast majority of through tickets and even the train service withdrawn before closure, it has removed all sensible consultation on the plans.
It’s that date OR 4 weeks after ORR ratification, whichever is later. It isn’t showing as ratified on ORR website yet, so I expect the latter situation now applies...The official closure notice for Newhaven Marine published 20 Jan 2020 gave the official closure date as being 26 September 2020.
It's all academic as there's no service anyway, but is that still what will happen and that's the official 'end of the line' for Newhaven Marine, making it the first complete closure since Angel Road?
Post #202 is roughly it I think. The concrete hard standing with a platform edge is still there, but all buildings were removed. Level crossing was closed, and the signal box demolished.What does the site look like these days? I visited about ten years ago, when it was largely intact and possible to wander around.
Post #202 is roughly it I think. The concrete hard standing with a platform edge is still there, but all buildings were removed. Level crossing was closed, and the signal box demolished.
Surely someone will get a last day ticket - and maybe demand a rail replacement taxi to Newhaven Harbour?The official closure notice for Newhaven Marine published 20 Jan 2020 gave the official closure date as being 26 September 2020.
It's all academic as there's no service anyway, but is that still what will happen and that's the official 'end of the line' for Newhaven Marine, making it the first complete closure since Angel Road?
so they can't even close a station properly that has no trains and an agreed process.
There's no chance the end is anywhere nigh for IBM or British Steel
IBM and British Steel Redcar are not closed; merely had the service suspended. For both locations the sites are expected to undergo redevelopment (well, before COVID hit anyway), with the likelihood of the services being reinstated when there is once again something there for passengers to travel to/from.
The North have steel works enthusiasts?They were both stations that technically were only available for those with legitimate business on the sites they were built to serve, so were sort of not available to the general public anyway. IBM was easy for punters to use because the business had closed some time before the station, but Redcar was a bit different. I got off a train there once and was swooped upon by a security guard within a minute or two. Thankfully he accepted my excuse of being an enthusiast, and escorted me to the gates.