  1. 59CosG95

    ECDP (East Coast Digital Programme) Updates

    Well, seeing as most of the other threads relating to ETCS/ERTMS on the southern ECML have been closed, I thought I'd start a new thread relating to updates on the scheme. Most recently: Peterborough PSB (1972-2023) has now been closed, with Biggleswade to Grantham now under the control of York...
  2. 59CosG95

    Tyne & Wear Metro OLE Renewals

    https://www.railtechnologymagazine.com/articles/tyne-and-wear-metro-upgrade-its-overhead-electrics-part-its-transformation Furrer + Frey have been awarded a contract to renew the 1.5kV DC OLE on the Tyne & Wear Metro, further increasing the "Swissification" of light rail in the North East. The...
  3. 59CosG95

    XC Fare Hike - pre-strike days

    My partner's trying to book a single from Peterborough to Leicester with a railcard; normally an off-peak ticket with that discount is £6.25. However, for Wed the 31st of May and Thurs the 1st of June, it's rocketed up to £17.55. That's a 181% increase! Is this because all the cheap seats have...
  4. 59CosG95

    Teesside/Durham Coast Line Resignalling

    Hi all, I found myself on a train from Darlington to Middlesbrough yesterday evening and saw evidence of the recent (2021) resignalling works between Thornaby & Middlesbrough. I couldn't help but notice that some of the works still remain outstanding, with some equipment/cabinet bases having...
  5. 59CosG95

    Eurostar refund due to missed connections

    Morning all, As I type, I'm going to miss my Eurostar back to the UK from Paris; the Praha - Zürich sleeper (which I'm in at time of typing) is 4 hours late, as the portion of the train that originated from Budapest ran late. As a result, I have missed my connecting TGV Lyria from Zürich HB to...
  6. 59CosG95

    Decarbonising the Western (Great Western Electrification - Part 2)

    Haven't seen a dedicated thread for this yet, so this seems to be the right place to start. https://www.modernrailways.com/article/decarbonising-western Glad to see that Tranche 0 looks very achievable in a shorter space of time, as the designs are mature. Tranches 3 to 5 look to be mainly...
  7. 59CosG95

    Old Oak Common (OOC) Enabling Works - GWML

    Couldn't find a good place to start with the enabling works on the GWML for Old Oak Common "conventional" station, so here goes. Colas Rail & the South Rail System Alliance (SRSA; of which Colas is a part) have been doing a fair bit of tweaking on the GWML to allow work at OOC to begin. Their...
  8. 59CosG95

    ECRs and ROCs - any transfer updates?

    Hi all, So far, AIUI, the following ECRs (Electrical Control Rooms) have been transferred to their ROCs (Rail Operating Centres): LNE (York): Yes (at York ROC) EM (Derby/East Mids Control Centre): No (MML still at York ROC. Due date of transfer to Dery ROC/EMCC unknown) Anglia (Romford): Yes...
  9. 59CosG95

    Peterborough P3 (Up Fast) Line Block

    Afternoon all, does anyone know why the Up Fast in PBO is blocked? It's given me the most unusual view of 700s arriving in P4 & P5 during off-peak hours before reversing in Spital Sdgs. I've also seen NR orange-folk in the Up Fast cess behind Vortok fencing - anyone know what the fault is?
  10. 59CosG95

    Potential changes to Transpennine Express traction / route allocations

    I keep hearing that, upon completion of the main TP corridor's wiring, the Nova 1s and Nova 3s will switch position, with an electric loco (poss. 93 or similar) taking over the Liverpool - Newcastle runs, while the 802s take over the Scarbados traffic. Of course that could all be folly, but it...
  11. 59CosG95

    GWML - OLE Alterations eastwards from Acton Main Line

    I'm not sure which thread to put this in, so I started one anew. Passing through the area on the weekend, I saw that two portal masts had gone up in the Main Cess & Relief Cess, just west of Acton ML station. The portal was boom-less on Saturday, but had gained a boom on Sunday with lots of...
  12. 59CosG95

    Could East-West Rail (EWR) be electrified?

    STOP PRESS. https://www.linkedin.com/posts/nicholstim_principal-ole-design-engineer-jacobs-careers-activity-6866677443760050177-4j3n Jacobs (EWR's Programme Delivery partner) are seeking out OLE Design Engineers for East West Rail. I think there's more detail to come in tomorrow's IRP...
  13. 59CosG95

    LNER App - Paypal not working?

    I've tried to use the LNER android app to pay for tickets on a number of occasions now, but it always says "Oops! Looks like you're not connected to mobile data or Wi-Fi" (or very similar words). Has anyone else had similar problems?
  14. 59CosG95

    Newton Aycliffe - Further Electrification on site

    This might be of interest to some on here - the currently non-electrified stabling sidings at the northern end of Newton Aycliffe (Merchant Park) Depot, Hitachi's main works in the UK - are getting wired up. A pair of booms have gone up over the roads, with conductors presumably due to follow...
  15. 59CosG95

    Booster Transformers - Scotland OLE Work

    Seeing as the old thread was closed last September, I couldn't think of where to put this. The RSAS (Rail Systems Alliance Scotland; NR + Babcock + Arcadis) have started a relatively low-profile project nr Carstairs Jn (I say low-profile as I can't find any detailed info); piling specialists Van...
  16. 59CosG95

    Proposals to reopen Exeter to Plymouth via Okehampton

    Moderator note: Split from https://www.railforums.co.uk/threads/preliminary-work-on-okehampton-line-progress-updates.210323 Not sure if anyone on here's seen the NRWG (Northern Route Working Group) blog lately, but this is their latest post...
  17. 59CosG95

    Northern Powerhouse Rail (NPR) - Latest plans & speculation

    From New Civil Engineer: Very interesting indeed - glad to see wiring of Leeds/Sheffield to Hull included too. No wires mentioned for the Hope Valley, sadly.
  18. 59CosG95

    Static Frequency Converters for AC Feeding - can they be used alongside autotransformers?

    On the second phase of the ECML Power Supply Upgrade, I have noticed that Static Frequency Converters (SFCs) are planned to be used for new grid connections. One is already installed at Potteric Carr (Doncaster) as an independent feeder for the IEP Depot & the ECML, utilising a 33kV grid...
  19. 59CosG95

    OLE Renewals - Anglia (GE, LTS etc.)

    Couldn't find a dedicated thread for this, so I've created one myself. So far, the entire GEML from Bethnal Green to Chelmsford (exc. Stratford) and the Southend Victoria branch are now fully renewed (AFAIK). Work has also apparently started on renewing OLE on the LTS route, including around...
  20. 59CosG95

    Northumberland Line to be re-opened to passengers

    This just in from New Civil Engineer: