wensley
Established Member
It was right wide, SOWC.
After a couple of quiet days overrunning engineering work near Retford is causing delays of up to 1 hour in both directions
Getting to be substantial delays. Does anyone know what overran? Dealing with the proper repairs to the earlier broken rails?
Believe it was a problem with the High Output Track Renewal Train and not linked to a previous issue.
Was on the 1130 Edinburgh to Kings Cross - sat outside Retford for about 5 to 10 minutes but that was it.
Believe it was a problem with the High Output Track Renewal Train and not linked to a previous issue.
Lucky you, I was on 1000 kgx-abd and ended up arriving 68L into edb after departing kgx on time. At least it wasn't 59 minutes late, so my delay repay is in the post....