TimboM
Established Member
- Joined
- 12 Apr 2016
- Messages
- 3,732
Class 90s hauled the Mk5s (via Mk3 translator coaches) on the 110 mph test runs, so cannot be all that impossible for them to run without being connected to a loco with the right TMS/computer on board?They would fall down well before that - the Mk5s have Scharfenberg couplers, not the traditional drawgear that the Mk5as have.