One would think if they're doing it over the long term they'd lower the track back down again instead ( I'm assuming it was raised when the tube stock first turned up ).In effect this work is being done for the next 30+ years. It therefore seems to me to be worth doing it well, so the line and its stations will require few if any repairs in that time.