Goldfish62
Veteran Member
- Joined
- 14 Feb 2010
- Messages
- 11,873
It's a wonder then that other TOCs are managing to increase service levels then. Wonder how they do it... Easy to blame the DfT for the recruitment freeze, but it takes two to tango as the saying goes.It seems SWR are stretched currently running the service they are now with the current staffing levels.
4tph would require pulling staff off other diagrams, which would need that work covering. A big recruitment drive paired with full 701 introduction is needed.
The near 2 year recruitment freeze post covid hasn't really helped.
Let's hope more positive times for SWR lie ahead. I say hope, because there has to be hope.