Class 730 LNR & WMR Delivery/test Updates

778

Member
Joined
4 May 2020
Messages
349
Location
Hemel Hempstead
Until the 730/2s come into play around December. There’s enough 730/0s to allow the Cross City, Walsall-Birmingham-Wolverhampton and the Chase Line to go over to 730/0 operation alongside the runs on Euston-Tring/MKC.
When the 5 car 730s enter service, will all of the 3 car 730s go straight away, or will they be used along side the 730/2s for a while, until there are enough 5 car units to replace them?

When the 730/0s leave the LNR local services, what WMR services are they planned to be used on?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AJDesiro

Member
Joined
10 May 2019
Messages
645
Location
Rugby
When the 5 car 730s enter service, will all of the 3 car 730s go straight away, or will they be used along side the 730/2s for a while, until there are enough 5 car units to replace them?

When the 730/0s leave the LNR local services, what WMR services are they planned to be used on?
It'd be stupid for them to just send all of the 3 cars over straight away, I don't think they're planned to be used on any other WMR services, considering there's enough for every planned service anyway, it would enable the cross city to go up to 6tph though, if it ever happens, another unit will likely be used on the new Walsall-Wolverhampton service via Willenhall.
 

JW4

Member
Joined
14 Feb 2023
Messages
272
Location
Birmingham
It'd be stupid for them to just send all of the 3 cars over straight away, I don't think they're planned to be used on any other WMR services, considering there's enough for every planned service anyway, it would enable the cross city to go up to 6tph though, if it ever happens, another unit will likely be used on the new Walsall-Wolverhampton service via Willenhall.
How many units are required for 6tph Cross-City with all 6 car?
 

DavidGrain

Established Member
Joined
29 Dec 2017
Messages
1,236
As I understand it, 6tph on the Cross City Line is not possible at Kings Norton with 2tph on the Camp Hill Line unless the unused platforms are brought back into use. The unused platforms are used by freight trains and passenger trains which do not stop at Kings Norton.
 

AJDesiro

Member
Joined
10 May 2019
Messages
645
Location
Rugby
As I understand it, 6tph on the Cross City Line is not possible at Kings Norton with 2tph on the Camp Hill Line unless the unused platforms are brought back into use. The unused platforms are used by freight trains and passenger trains which do not stop at Kings Norton.
WMR and Andy Street have expressed aspirations to get this sorted out faster, exactly how, I don't know, though I'd imagine it is possible. Kings Norton is meant to receive a remodeling as part of Midlands Rail Hub, though that's some time away!
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
5,705
Location
Croydon
Looking at Part Time Spotter, I can see the allocation for 1st March.
Is it possible to see allocation for previous days on Part Time Spotter - and if so how?
Many thanks
+
Just scroll further down the blog.
Its all in the Blog in reverse date order, latest at the top. Not within each subject but within the top page (home-ish page).
 

45076

Member
Joined
4 Feb 2021
Messages
237
Location
Midway, South Derbyshire
how many 730/2s have been delivered and how many more are due to be delivered but also will they enter service in December 2024
From what I can gather :
201(101) is at Old Dalby
202 is at Old dalby
203 (103) is at Loughborough
204 in production
205 testing at Oxley
206 is at Loughborough
207 in production
208 in production
209 in production
210 testing at Oxley
211 testing at Oxley
212 testing at Oxley
213 in production
214 in production
215 in production
216 in production
217 testing at Oxley
218 in production
219 in production
220 in production
221 in production driving cars visible from London Road
222 in production
223 in production
224 in production
225 in production
226 in production
227 in production driving cars visible from Litchurch Lane
228 in production driving cars visible from London Road, 1 centre car visible from Osmaston Road
229 in production driving cars visible from Litchurch Lane
230 in production
231 in production 2 cars visible from Osmaston Road
232 in production
233 in production
234 in production
235 in production
236 in production

There are a lot of un-numbered vehicles at Litchurch and a number of gangway ends and bodysides in green waiting to enter the assembly plant.
 

ls2270

Established Member
Joined
24 Oct 2012
Messages
3,642
730210 and 211 working 2Q20 to 2Q30 test runs today between Oxley, Crewe and Nuneaton.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
4,481
350s on Chase, London Birmingham, and St Albans Abbey.
Everything else electric will be 730.
London - Birmingham and St Albans are 350 only. Trent Valley is a 350/730 mix (IIRC, more 730s on the weekends), London-MKC/Tring is pure 730s.

Most Liverpools will be 730s though I wouldn't be suprised if a 350 pops up occasionally.
 

778

Member
Joined
4 May 2020
Messages
349
Location
Hemel Hempstead
London - Birmingham and St Albans are 350 only. Trent Valley is a 350/730 mix (IIRC, more 730s on the weekends), London-MKC/Tring is pure 730s.

Most Liverpools will be 730s though I wouldn't be suprised if a 350 pops up occasionally.
Will Stafford - Crewe still be 350s?
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
4,983
The correct plans for utilisation have been posted previously, including Rugeley - Intl being 730/0, and Potteries being 350.
 

AJDesiro

Member
Joined
10 May 2019
Messages
645
Location
Rugby
The correct plans for utilisation have been posted previously, including Rugeley - Intl being 730/0, and Potteries being 350.
I reckon WMR's Twitter have gotten it wrong, it certainly wouldn't be the first time. The latest issue of Modern Railways states that the remainder of the rollout will begin on Rugeley - Intl and Walsall - Wolves after the Cross City. Their superior acceleration when compared to a 350 should hopefully mean a slight reduction in journey times on this route. Of course, you seem to be in the know.
 