NightStar
Member
Good Evening, I was just wondering if there was any truth to the rumor about EPS Class 37/601 and Class 37/612 being fitted for 100mph or atleast ran at 100mph? I remember reading somewhere on the web that these two units were different from the other 10 EPS 37/6 locos for speed gearing and for non fitment of some equipment the others got?
Second, Which of the 12 EPS units had so called tunnel lights fitted to the front?
Robert
Second, Which of the 12 EPS units had so called tunnel lights fitted to the front?
Robert