On another note, would anyone have details of whether the Canton starter is booked to work 1W11 or 1W13 this week please?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ATP

Member
Joined
21 May 2015
Messages
15
Looks like a swap on 1W55 this morning. Is that down to the disruption around church stretton?
 

The Prisoner

Member
Joined
22 Aug 2012
Messages
331
Apologies if this has been covered, but is there any plan to use these on the Holyhead - Cardiff services other than the Gerald? I'd been planning a trip from Chester to Swansea, but it seems to be a constant stream of 197s or even 150s. Sure there used to be Mk 4s a year or two back (my office overlooks the viaduct next to Chester Racecourse).
 

berneyarms

Established Member
Joined
26 Nov 2013
Messages
2,813
Location
Dublin
Apologies if this has been covered, but is there any plan to use these on the Holyhead - Cardiff services other than the Gerald? I'd been planning a trip from Chester to Swansea, but it seems to be a constant stream of 197s or even 150s. Sure there used to be Mk 4s a year or two back (my office overlooks the viaduct next to Chester Racecourse).
No they have reallocated the sets to Cardiff-Manchester.
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
3,685
Looks like a swap on 1W55 this morning. Is that down to the disruption around church stretton?
Seems to be down to the issues at Sutton Bridge, a set was left in Holyhead for the same reason. So everything is in place for tomorrow HD01 will work the 16:49 to Crewe rather than 17:14 Holyhead later on.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,109
Just to follow up on this, notices have appeared saying the changes will take place in "early April". As expected, the MU speeds are going, and being replaced for the most part with a 90/70 passenger/freight differential instead. The last two miles of the up approaching Harlescotte will be 85/70, so a slight slowing down for DMUs on this section, but it'll only add seconds at most. Loco hauled services should gain several minutes from being able to run at 90 vice 70.
Conformed in next week's WONs, the linespeed changes Crewe - Shrewsbury go live from Sunday April 7th.
 

IslandLine101

Member
Joined
8 Dec 2022
Messages
30
Location
Shropshire
Will the timetables be sped up in June to account for this? And do we know how they're getting on with Onibury to Shrewsbury? Its great to see progress being made
 

BillStampy

Member
Joined
6 Jan 2024
Messages
233
Location
Llanharan
67012 allocated to Manchester start tomorrow morning (with HD04), first run in passenger service for TfW in a long while, I plan on seeing it on 1V50 tomorrow aswell.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,109
Will the timetables be sped up in June to account for this?
Probably not. More likely they'll wait till the big timetable change in December. Plus there isn't that much space to tighten the times - the existing times are very tight and a struggle to meet with the current limits
And do we know how they're getting on with Onibury to Shrewsbury? Its great to see progress being made
No news or signs of work, but that isn't too concerning. It was the same with Crewe - Shrewsbury until last week when the new speed boards (bagged over) suddenly appeared.
 

185

Established Member
Joined
29 Aug 2010
Messages
5,034
There is still connectivity across Cardiff. Yes it's only 2 hourly now instead of hourly, but given the vast majority of passengers on both sides leave the train at Cardiff that seems a reasonable compromise to me.
They should run Manchesters hourly on to Swansea, whilst anything coming from the west of that should instead be tied in with services to Wrexham / Holyhead / Chester etc.

Yet another totally rammed 2-car 197 on Cardiff-Manchester on Saturday (1W16, 1311 arrival at Man Picc) with 20-30 being left on many stations on route. This was whilst 1D38 (1326 Airport-Picc-Llandudno) was noticed with 2x197s a 4-car, lightly loaded. The whole 197 order should have been 3-car.
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
3,685
67012 allocated to Manchester start tomorrow morning (with HD04), first run in passenger service for TfW in a long while, I plan on seeing it on 1V50 tomorrow aswell.
Been a while to get 012 back, hopefully some of the other missing ones (017 and 020 being the longest now) will follow suit.

Been lots of loco swapping recently so now have:
HD01+67008
HD02+67014 (swaps to 010 on Friday)
HD03+67010 (swaps to 014 on Friday)
HD04+67012
HD05+67013
HD06+67022
HD07+67025
 

Lurcheroo

Member
Joined
21 Sep 2021
Messages
588
Location
Wales
Yet another totally rammed 2-car 197 on Cardiff-Manchester on Saturday (1W16, 1311 arrival at Man Picc) with 20-30 being left on many stations on route. This was whilst 1D38 (1326 Airport-Picc-Llandudno) was noticed with 2x197s a 4-car, lightly loaded. The whole 197 order should have been 3-car.
I assume it was seen at Piccadilly, hard to say as it could well be that 4 car is working a ‘busier’ diagram than the unit you were on which may be its only overcrowded service of the day. and whilst the 4 car is lightly loaded at that time could we’ll spend other times of day being very busy where a 2 car is unsuitable. It could possibly have been incredibly busy on its previous run into Piccadilly and the airport (possibly busier than your service would have been if it was a 4car) How do you assign units in that case ?
I agree that clearly the service you were on needed more than 2 coaches but that doesn’t mean the other shouldn’t be a 4 car.

As for the ordering of 2 coaches, 2 coach units ARE needed. I’ve explained it many times on here, but as an example plenty of Cambrian services need not be more than 2 coaches. And I’m sure there’s plenty of other services that equally don’t need to be more than 2.
And please don’t misunderstand me, I appreciate it would give a guarantee of getting no less than 3 coaches if they all were, but the real issue is just getting everything into service so that marches services don’t need to run as 2 cars just to run something.
 

Topological

Member
Joined
20 Feb 2023
Messages
817
Location
Swansea
Marches will be fine as 3+2, which is being introduced in December 2023. The problem seems to be getting to that point.

However, TfW seem to have prioritised getting 197s onto Maesteg so we are still seeing the Marches left short, or even worse with 2-car 150s.

IF the Mk4 can at least be reliable enough to run the 1 less than planned diagrams then maybe there will be some double 197s on the Marches soon.

At least all 7 Mk4 have a loco now according to @sd0733 post.
 

Lurcheroo

Member
Joined
21 Sep 2021
Messages
588
Location
Wales
Marches will be fine as 3+2, which is being introduced in December 2023. The problem seems to be getting to that point.

However, TfW seem to have prioritised getting 197s onto Maesteg so we are still seeing the Marches left short, or even worse with 2-car 150s.

IF the Mk4 can at least be reliable enough to run the 1 less than planned diagrams then maybe there will be some double 197s on the Marches soon.

At least all 7 Mk4 have a loco now according to @sd0733 post.
Looking at RTT today anything from south wales to Manchester Piccadilly has been minimum of 3 cars with a few 4 and 5 car services.

Looks like only 1 2 car yesterday with everything else being 3,4 or 5.

Saturday did have quite a number of 2 car services though.
 

Topological

Member
Joined
20 Feb 2023
Messages
817
Location
Swansea
Looking at RTT today anything from south wales to Manchester Piccadilly has been minimum of 3 cars with a few 4 and 5 car services.

Looks like only 1 2 car yesterday with everything else being 3,4 or 5.

Saturday did have quite a number of 2 car services though.
That is really good, long may it continue.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
4,617
Marches will be fine as 3+2, which is being introduced in December 2023. The problem seems to be getting to that point.

However, TfW seem to have prioritised getting 197s onto Maesteg so we are still seeing the Marches left short, or even worse with 2-car 150s.

IF the Mk4 can at least be reliable enough to run the 1 less than planned diagrams then maybe there will be some double 197s on the Marches soon.

At least all 7 Mk4 have a loco now according to @sd0733 post.
The only trains that often turn out a 150 now are 1W92, 1V97 and 1W98 instead of a 158.
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
3,685
Been a while to get 012 back, hopefully some of the other missing ones (017 and 020 being the longest now) will follow suit.

Been lots of loco swapping recently so now have:
HD01+67008
HD02+67014 (swaps to 010 on Friday)
HD03+67010 (swaps to 014 on Friday)
HD04+67012
HD05+67013
HD06+67022
HD07+67025
Been some changes to this (already!)

67010 will now come off HD03 at Canton with 67015 heading down later to replace it, HD06 now has 67013 coming off HD05.

HD04 will tonight finish in Holyhead and like HD02 before it will enter temporary storage waiting for 02 to finish its exam at Crewe before heading there for B exam and 5 car. 67012 will return to Crewe as a spare loco.


The 05:30 from Holyhead will be a unit tomorrow as HD04 won't come out so HD05 will pick up the rest of the diagram from the 10:52 from Cardiff.
 
Last edited:

BillStampy

Member
Joined
6 Jan 2024
Messages
233
Location
Llanharan
Lots of diagram changing then! Thankfully there isn't a major disruption caused by this except for tomorrows 0530, HD06 has taken HD03s diagram on 1V50 aswell.
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
3,685

Western 52

Member
Joined
19 Jun 2020
Messages
1,133
Location
Burry Port
Today's 1W56 has terminated at Cardiff. 67025 was making a howling noise on the run from Swansea. Not heard a 67 do that before.
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
3,685
it was apparently previously cancelled at Swansea, then uncancelled, now cancelled again? That 67 can't be healthy!
It was a buzzer defect in the DVT so unrelated to the 67.
Extremely poor day with 0 sets now out.
 
Last edited:

Jez

Established Member
Joined
22 Jan 2011
Messages
1,327
Location
Neath
It was a buzzer defect in the DVT so unrelated to the 67.
Extremely poor day with 0 sets now out.
According to RTT the train wasn't restarted at Cardiff with a unit. Was nothing available?
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
3,685
According to RTT the train wasn't restarted at Cardiff with a unit. Was nothing available?
It wasn't, it was cancelled. There's lots of shortforms with faults across the entire 15x/197/Mk4 fleets today so not great all round with multiple 2 or 3 instead of booked 4s and 5s
 

Top