seasidersfan
Member
My line is Blackpool North and it's being electrified so I'm pretty happy. Although ideally I'd want a new station building too. I'd actually choose an upgrade to the Blackpool South line and integrate trams into it.
For the Fort Bill - Mallaig line, I wouldn't actually do much. Just build a new private halt at Essan (between Glenfinnan and Lochailort)And replace all services with steam locos.
I'd actually like to see the German "fancy DMU branch line" approach tried somewhere in the UK like the Marston Vale. So that would be...
- New Stadler WINK DMUs x3 (2 in use, one spare), high power for quick acceleration. Modern, route-branded livery advertising attractions on the line, units to have locally relevant names and the local connections celebrated generally
- Perfect clockface hourly timetable with proper connections (ideally use P5 where not in other use)
- Driver controlling doors, giving an aim for station stops to be for no more than 30 seconds total - but guard to be required and safety trained (needed for selling tickets anyway)
- Platforms modified and lift at Bletchley for level boarding throughout using Stadler style moving steps
- Ideally operate through to MKC bay.
interesting. I note this board seems to have developed some kind of fetish for these Sadler trains! What is so special?
They offer some key features that nobody else does (to the UK; similar designs are fairly common in mainland Europe, some better than others).
- Power module separate from the coaches so the environment is similar to LHCS, much quieter and less rattly than a regular DMU. It's basically a mini locomotive between the two articulated halves
- Low floor design allowing level boarding at UK platforms with a moving step
- Big windows with the option of panoramic windows continuing into the roof
- Small production runs possible at an affordable price with customisation - instead of one standard train as the others offer, the design is modular from standard body panels but offers customisation options - things like window layouts, doors, floor height etc.
I think from the point of view of the board they're also interesting because they are different - most new-build UK trains are boringly conventional - 20m/23m vehicles, doors at ends or quarters/thirds, high floor etc.
I live right next to East Grinstead station.
My fantasy modernisation plans for the Oxted lines would include:
East Grinstead line
Rebuild Haywards Heath - Ardingly & electrify through to East Grinstead via Kingscote (alternative to BML). Bluebell Railway would be curtailed to Sheffield Park - Horsted Keynes (sorry steam lovers)
Lifts at East Grinstead.
Bi-directional working through to South Croydon.
Additional platform brought back into use at Lingfield.
Reinstall Crowhurst spur link to Tonbridge line.
Uckfield Line
Double track the Uckfield line.
Electrify Uckfield line.
Extend the line to Lewes.
Signalling/trackwork to allow direct running into Oxted platform 3 from the south.
Possible spur from Ashurst to Tunbridge Wells (usurping Spa Valley Railway).
Put the (soon to be redundant) 458/5's on Southern Metro services & move the remaining 377's down to the Wealden Line!
My line's probably Chat Moss, although Liverpool WCML spur is nearby too.
Quite happy with the electrification of Chat Moss. The Class 319s are quite old but better than what we were used to. Ideally we'd have new EMUs and the completion of Merseyrail for the east of the city.
Wavertree Technology Park really could just be called Wavertree or Wavertree North. I'd have a station on the WCML called Wavertree South either where the old station was or slightly further north and all would be well. A higher frequency of stoppers on both lines would be welcome too.
Improvements to my local line which is the Nuneaton - Leicester line.
■ At least 2 tph all station stoppers off-peak, increasing to 3 or4 tph peak.
■ Reopen stations at Elmesthorpe, Croft and Stockingford.
■ Water Orton remodelling to accomodate the changes.
■ Electrify the route through to Leicester so Class 170's can be cascaded to strengthen services to Stansted Airport.
4-car DMUs for Leeds - Carlisle.
This is another line where proper "scenic" tourist DMUs with panoramic windows and First Class (money for old tourist rope at say £20 an upgrade) should be used.
I was with you until the line about housebuilding. Plenty of brownfield opportunities closer to Leeds and Bradford rather than building on greenfield sites here in the Dales.Aire/Wharfe Valley lines
Infrastructure
Four track Leeds to divergence of Airedale and Wharfedale lines just before Apperley Bridge station.
Reinstate through lines at Ilkley through Addingham and onto the Bolton Abbey Line and onto Skipton.
Electrify throughout this new link.
Build 2 new platforms at Skipton where this line rejoins the Airedale Line.
Electrify through to Hellifield and build a new 150m platform where the steam trains stop for water currently.
Build large amounts of housing stock in Addingham, Embsay, Ilkley, Skipton, Gargrave and Hellifield.
Service Pattern
2tph Leeds to Ilkley current service extended to Hellifield all stops.
Leeds to Carlisle and Morecambe/Lancaster diverted via Ilkley vice Keighley and made alternative hour clockface.
Freight diverted via Ilkley vice Keighley.
Released paths used to add 3rd tph Leeds to Skipton via Keighley with current calling pattern.
3rd tph London KX to Leeds added, routed via Hambleton curve and extended to Skipton calling at Shipley, Bingley and Keighley.
Rolling Stock
6-car 23m EMUs with SDO on all services.
3-car 23m BEMUs for Leeds to Lancaster/Morecambe
4-car DMUs for Leeds - Carlisle.
For the Fort Bill - Mallaig line, I wouldn't actually do much. Just build a new private halt at Essan (between Glenfinnan and Lochailort)And replace all services with steam locos.
There might need to be some adjustment to the timetables to allow better connections with Evesham as well .....
Aire/Wharfe Valley lines
Infrastructure
Four track Leeds to divergence of Airedale and Wharfedale lines just before Apperley Bridge station.
Reinstate through lines at Ilkley through Addingham and onto the Bolton Abbey Line and onto Skipton.
Electrify throughout this new link.
Build 2 new platforms at Skipton where this line rejoins the Airedale Line.
Electrify through to Hellifield and build a new 150m platform where the steam trains stop for water currently.
Build large amounts of housing stock in Addingham, Embsay, Ilkley, Skipton, Gargrave and Hellifield.
I approve of this haha.Who doesn't love a bit of dreaming....
So London - Aylesbury and others concerned...
- Electrified throughout
- Met line cut back to Rickmansworth, new 4 track station built next to the car park and Waitrose
- New link from Paddington/Old Oak to become the Chiltern branch of Crossrail
- All platforms from Chorleywood to Aylesbury extended as needed to accommodate full length Class 345's
- Modern signalling to give much better headways!
- 4tph to Aylesbury, 2tph to Chesham + 2tph to Amersham in peaks. No more all stations met line crawlers from the City to Amersham/Chesham ever again. Ever!
- Heads banged together by whoever concerned to get a move on with the Croxley Rail Link.
- Electrified link at Neasden Junction retained so that...
Chiltern Main Line
- Electrified throughout
- Class 88's* + MK5's ordered for the Birmingham fasts main line and Oxford peak services. (* Or souped up version, UK TRAXX etc if line upgraded for 125mph running)
- Platforms extended to accommodate at least 8 Car Aventra/Desiro etc.
- New units as above to run in either 4 or 8 car configuration as needed. No more 2,3,4,5,6 car combinations causing confusion.
- Paths freed up at Marylebone by the Aylesbury services gone to the above to be used for new services.
- No more 2 car Class 165's on Marylebone - Birmingham runs ever again. Ever!
Now where's that blank chequebook I found...?
I live right next to East Grinstead station.
My fantasy modernisation plans for the Oxted lines would include:
Uckfield Line
Double track the Uckfield line.
Electrify Uckfield line.
Extend the line to Lewes.
Signalling/trackwork to allow direct running into Oxted platform 3 from the south.
Possible spur from Ashurst to Tunbridge Wells (usurping Spa Valley Railway).
Put the (soon to be redundant) 458/5's on Southern Metro services & move the remaining 377's down to the Wealden Line!
but for starters I would settle for stopping all the peak Uckfield trains additionally at Sanderstead instead of just the late evening southbound ones.
I wonder what the C:B for electrification of Leicester to Birmingham would be.
If the wires ever reach Leicester (which I think they will in the next 10 years) then part of the project is done already. It's also a key freight route, and wiring from Nuneaton into Birmingham would allow class 390s to divert in the event something's buggered on the coventry line.
Gralistair, fancy forming an Electrification Party?I have been thinking exactly the same myself over the last few weeks. It could even be spun positively. Mr Speaker " We are giving immediate approval to electrify Birmingham New St via Water Orton to Leicester. It gives a valuable diversionary route. It allows us to move to Birmingham New Street being entirely free of diesel fumes. It allows us to start in our long term goal of a green environment and economy by making a start on electrifying the key freight route from Harwich to Nuneaton. I commend it to the house. ( It also allows us to back pedal on MML electrification - we need to get to Market Harborough anyway and from there it is sa short hop to Leicester which is already electrified anyway!!)
Gralistair, fancy forming an Electrification Party?