    The valley lines has already started with a new electric depot being built at radyr
     
  2. Optom1

    Optom1 Member

    Messages:
    79
    Joined:
    20 Sep 2019
    Location:
    Cardiff
    Sorry its at Taffs Well
     
  3. jimm

    jimm Established Member

    Messages:
    5,045
    Joined:
    6 Apr 2012
    Several pictures of today's high-speed pantograph tests train with 90035 between Swindon and Didcot on the recent additions page of Martin Loader's website.

    http://hondawanderer.com/index.htm
     
  4. stj

    stj Member

    Messages:
    130
    Joined:
    15 Apr 2019
    I remember in 1976 the wires at the start of the Blackpool branch at Preston and a friend thinking it was going all the way to Blackpool, it has but 40 years later!
     
  5. R G NOW.

    R G NOW. Member

    Messages:
    387
    Joined:
    25 Jan 2019
    Location:
    gloucester
    They will probably be moved onto oxford to complete that next as I read somewhere it was to be done by the end of cp6.
     
  6. R G NOW.

    R G NOW. Member

    Messages:
    387
    Joined:
    25 Jan 2019
    Location:
    gloucester
    Just outside Cardiff I think.
     
  7. swt_passenger

    swt_passenger Veteran Member

    Messages:
    22,075
    Joined:
    7 Apr 2010
    Don’t bank on it. The “CP6” has been printed alongside Didcot to Oxford in the successive enhancement delivery plans for quite a few years, but since March there’s no further updates at all, and 6 months into CP6 nothing whatsoever has been confirmed. The same ”CP6” applies to Filton Bank, and Chippenham to Bristol Temple Meads. Other routes such as Basingstoke, Windsor, Henley, all show “assumed CP6” as well.
     
  8. Envoy

    Envoy Established Member

    Messages:
    1,395
    Joined:
    29 Aug 2014
    That is bonkers - to have a delay and not get the guys who are expert at putting up the catenary transferred straight over to Didcot to Oxford along with the Filton bank and then the route through Bath. Perhaps the Welsh Government/Amey could get them straight to work on wiring the valleys north of Cardiff - or are we STILL waiting for them to be transferred from Network Rail?
     
  9. swt_passenger

    swt_passenger Veteran Member

    Messages:
    22,075
    Joined:
    7 Apr 2010
    Yes it is bonkers, but it still seems people are unaware, although the lack of any of certainty has been discussed regularly in this thread for a couple of years.
     
  10. Glenn1969

    Glenn1969 Member

    Messages:
    944
    Joined:
    22 Jan 2019
    I thought some of these deferments were until "at least CP6" which means they could be held back to CP7 or beyond
     
  11. swt_passenger

    swt_passenger Veteran Member

    Messages:
    22,075
    Joined:
    7 Apr 2010
    None of the GW Projects are described that way in the Mar 2019 EDP, but I haven’t checked every earlier version.
     
  12. ATW158Xpress

    ATW158Xpress Member

    Messages:
    263
    Joined:
    6 Dec 2016
    Is there any update as to when wires west of Bristol Parkway will be signed off for passenger trains to run on electric?
     
  13. Jamesrob637

    Jamesrob637 Established Member

    Messages:
    1,164
    Joined:
    12 Aug 2016
    Some 800s were on diesel through Didcot yesterday.
     
  14. Richard Scott

    Richard Scott Member

    Messages:
    140
    Joined:
    13 Dec 2018
    A pair went through West Drayton today on diesel so may be diesel only restrictions. We definitely went electric all the way from Swindon to Didcot this morning.
     
  15. JN114

    JN114 Established Member

    Messages:
    2,269
    Joined:
    28 Jun 2005
    2 Units on the diesel only list for today - both 5 cars. The units they are paired to will thus necessarily be on diesel also.
     
  16. Wilts Wanderer

    Wilts Wanderer Established Member

    Messages:
    1,170
    Joined:
    21 Nov 2016
    Why is that out of interest? The ability to run a 10-car train with one set on diesel and one set on electric was, IIRC, a required functionality of the IET trainset. I’ve also heard first hand of at least one instance of it happening in service. Why doesn’t it happen more often? Surely the drivers are trained on this split-mode working.
     
  17. sk688

    sk688 Member

    Messages:
    532
    Joined:
    11 Sep 2016
    Location:
    Bath
    I was on the 0359 from Swansea to Paddington on Saturday Morning , and just before Didcot our train came to a complete halt , before switching to diesel through Didcot , and then went back to electric soon after . Very weird , and not sure why that happened
     
  18. Chris M

    Chris M Member

    Messages:
    907
    Joined:
    4 Feb 2012
    Location:
    London E14
    That suggests it was something to do with the infrastructure in the Didcot area rather than something to do with the train.
     
  19. YourMum666

    YourMum666 Member

    Messages:
    6
    Joined:
    11 Nov 2019
    Location:
    United Kingdom
    Guys will the Cheltenham and Hereford routes go electric



    Please reply
     
  20. Mag_seven

    Mag_seven Established Member Associate Staff General Discussion

    Messages:
    5,934
    Joined:
    1 Sep 2014
    Location:
    here to eternity
    Not in the foreseeable future.
     
  21. YourMum666

    YourMum666 Member

    Messages:
    6
    Joined:
    11 Nov 2019
    Location:
    United Kingdom
    Woah apparently the line to Plymouth could be electrified in the near future "in strips" According to DFT im gonna post the link

    https://www.google.com/amp/s/www.pl...electrification-could-speed-trains-496964.amp

     
    Last edited by a moderator: 26 Nov 2019
  22. yorkie

    yorkie Forum Staff Staff Member Administrator

    Messages:
    46,635
    Joined:
    6 Jun 2005
    Location:
    Yorkshire
    Let's await the outcome of the feasibility study for now, and try to keep this thread for actual progress please :)

    Also just a gentle reminder that if anyone wishes to make any suggestions for how the route should be electrified further, please don't hesitate to post these suggestions, but they must be made in the Speculative Ideas section, thanks :)
     
  23. swt_passenger

    swt_passenger Veteran Member

    Messages:
    22,075
    Joined:
    7 Apr 2010
    Welcome to the forums, but unfortunately you found something on Google thats 2 years old, and it was posted here at the time:
    https://www.railforums.co.uk/thread...fication-progress.83452/page-191#post-3133338
    This is a long drawn out saga, and it’s easy to clutch at straws...
     
  24. Optom1

    Optom1 Member

    Messages:
    79
    Joined:
    20 Sep 2019
    Location:
    Cardiff
    Platform 4 and its approaches still not wired at Cardiff Central.
     
  25. ATW158Xpress

    ATW158Xpress Member

    Messages:
    263
    Joined:
    6 Dec 2016
    I suspect this will get wired in the Christmas blockcade.
     
  26. Optom1

    Optom1 Member

    Messages:
    79
    Joined:
    20 Sep 2019
    Location:
    Cardiff
    Working on lineside conduits today
     
  27. ATW158Xpress

    ATW158Xpress Member

    Messages:
    263
    Joined:
    6 Dec 2016
    I believe the catenary wire is installed though P4 last time I visited.
     
  28. Fougasse

    Fougasse Member

    Messages:
    52
    Joined:
    3 Apr 2018
    Electric services to Newport due to start from 15 Dec according to brief I was at today.
     
  29. YourMum666

    YourMum666 Member

    Messages:
    6
    Joined:
    11 Nov 2019
    Location:
    United Kingdom
    What about the Wotton Bassett to Filton electrification. Will we be seeing that next year??
     
  30. YourMum666

    YourMum666 Member

    Messages:
    6
    Joined:
    11 Nov 2019
    Location:
    United Kingdom
    I mean Since Cardiff is close to being done. Maybe Network rail can transfer
     