Sean Emmett
Member
- Joined
- 9 Mar 2015
- Messages
- 511
800 010 running with 2 engines out.
what diagram was that on..and was it running alone..or coupled up to another unit?800 010 running with 2 engines out.
Are you aware that the front car and rear cars do not have diesel engines on these 5 car units? Only the 3 middle cars have diesel engines800 010 running with 2 engines out.
800010 was working with 800012 today and looking at Real Time trains for its various diagrams, there is no suggestion of bad timekeeping (which you would associate with 2 or more engines not working) - its first diagram today was 06:45 Paddington - Swansea then 10:29 Swansea - Paddington. It was then diagrammed for a run to Cardiff and back.what diagram was that on..and was it running alone..or coupled up to another unit?
IET /IEP's are not currently scheduled to run to/from Taunton on advertised diagrams at the moment. Your best bet is to go north to Bristol Temple Meads and you will find a few working Paddington services from there.Could anyone please tell me if I could get on IEP from Taunton? And what times thxs
IET /IEP's are not currently scheduled to run to/from Taunton on advertised diagrams at the moment. Your best bet is to go north to Bristol Temple Meads and you will find a few working Paddington services from there.
Looking medium / longer term, have GWR announced which routes will be a single train & which will be double. I know there's the Bristol route that splits at Swindon (without being timetabled to stop here) the which will be 2.
I'm thinking the Cheltenham trains especially
Could anyone please tell me if I could get on IEP from Taunton? And what times thxs
From "December 2018" they will be a mix of 5, 9 or 10, depending on time of day and if they sort out Gloucester for 10 car working
Sort out a separate "Gloucester only" service, or to do with platforms etc?
Platforms 1 & 2 on their own are too long for a 10 car.
I was on 800012/800010 today on 1229 Swansea to Padd, all engines working and the speed at Badminton was 96 mph.To clarify - yesterday's 10.29 SWA PAD with 800 012 and 800 010 had 2 engines out on 010 i.e. only one working on that unit, four in total.
Door probs at Port Talbot caused 21 min late dep from CDF. Only lost a furthet minute to Swindon, where I alighted, due to clear road and skilfull driving. But note that Didcot stop was missed out
Later run on 16.56 ex CDF had slower starts and stops and was loising time well before the signalling problems at Wootton Bassett.
Too short, surely? There is a 9/10 car stop board on platform 2, but I guess this would put the rear of the train in advance of G133 for changing ends.
19.30 from Paddington to Weston SM is an IET this evening.
As booked. Was omitted from Post '#1 but corrected in Post #14.
watched 8000012+800010 depart Reading after I got off. centre car of 800010 had engine outI was on 800012/800010 today on 1229 Swansea to Padd, all engines working and the speed at Badminton was 96 mph.
Not sure whether this has come up on any of the IET related threads, but not only was that the first IET to convey paying passengers west of Bristol, but on the return it was the first one conveying passengers {probably not very many given the hour) through Melksham, Trowbridge and Newbury.I can confirm that Weston Milton has had its first visit from an IET in public service. Now on the return.
As booked. Was omitted from Post '#1 but corrected in Post #14.
21:29 off Taunton for Paddington via Bristol TM is now booked an IET.Could anyone please tell me if I could get on IEP from Taunton? And what times thxs
21:29 off Taunton for Paddington via Bristol TM is now booked an IET.
Detach and attach in service is not currently happening while Agility iron out some minor issues.
OK leaving aside the temporary problems with attaching and detaching in service, what was actually supposed to happen if the 1730 Padd - Taunton detached a set at Bristol TM which returned to the depot? Presumably the 2129 Taunton to Paddington wouldn't have been a 5 car set all the way as that would have caused an imbalance in the number of sets finishing at London and Bristol.No attaching/detaching at Bristol TM permitted until sorted