Bromley boy
Established Member
- Joined
- 18 Jun 2015
- Messages
- 4,611
Now that the mid-Kent line and Lewisham have been re controlled to TBROC, how many panels and signallers are left in London Bridge PSB?
I understand (but forgot to look earlier when I was in the area) Angerstein junction, Charlton etc. are still controlled by LBPSB. So I assume at least one panel remains?
Assuming that’s the case, when is the final closure of LBPSB and will there be any kind of event, tours of the box etc. to mark it?
I understand (but forgot to look earlier when I was in the area) Angerstein junction, Charlton etc. are still controlled by LBPSB. So I assume at least one panel remains?
Assuming that’s the case, when is the final closure of LBPSB and will there be any kind of event, tours of the box etc. to mark it?