Can confirm there have been no wires that have been put up between Bedford and Kettering as of today’s date.
Not sure about the Corby branch.
I didn't even see any SPS in the right position to be wired yesterday evening. All the smaller steel work over the slow lines is still turned 90 degrees from where it needs to be, I don't think there's any ready to be wired unless it's over the fast lines.
More generally i was disappointed by the lack of apparent progress, especially on 4-tracking where all the difficult bits around Wellingborough don't really seem to have been started. Is there any inside gossip about whether the project on schedule?