jgwilliams2009
Member
- Joined
- 20 Dec 2009
- Messages
- 16
if this has been asked before please accept my apologies.
could anybody inform me what the new track panels, points and ballast etc are doing next to the line from thornaby stn to bowes field jct, seems like new track is going through the new tunnel that was built in conjunction with the building of the new A 1130 rd.
could anybody inform me what the new track panels, points and ballast etc are doing next to the line from thornaby stn to bowes field jct, seems like new track is going through the new tunnel that was built in conjunction with the building of the new A 1130 rd.