Running through OTT for a Thursday in September, further on from my post above this is what the off-peak looks like:

1A xx01-xx15 Leeds term
1B xx53-xx18 Matlock term
1C xx30-xx34 Norwich thru
2 xx23-xx45 Skegness term
3A xx44-xx55 RHL term
4 xx14-xx17 Lincoln thru
also xx36-xx45 LLS thru
5A xx19-xx25 RHL term
5B xx05-xx37 Birmingham XC term
7 xx59-xx28 London fast term
also xx31-xx32 Leicester stop thru

Unfortunately it appears that the two ECS shunts to Eastcroft will continue:
the xx3x XC arrival on 1C or 3C to 6B, and
the xx26 222 arrival on platform 6A to 6A again.

If I'm honest I am slightly disappointed that you've got the likes of the Matlock train still using a through platform for example. I'm most upset that they still feel the need to ECS shunt when in theory you should have less reason to now. This still feels too much like the old pattern and I hope in time that timings will change and capacity will get better as the new system beds in. Otherwise if this is how it will look long term it's quite upsetting really, with trains still cutting across two/three lines at the entrance to get to a platform.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,110
Running through OTT for a Thursday in September, further on from my post above this is what the off-peak looks like:

1A xx01-xx15 Leeds term
1B xx53-xx18 Matlock term
1C xx30-xx34 Norwich thru
2 xx23-xx45 Skegness term
3A xx44-xx55 RHL term
4 xx14-xx17 Lincoln thru
also xx36-xx45 LLS thru
5A xx19-xx25 RHL term
5B xx05-xx37 Birmingham XC term
7 xx59-xx28 London fast term
also xx31-xx32 Leicester stop thru

Unfortunately it appears that the two ECS shunts to Eastcroft will continue:
the xx3x XC arrival on 1C or 3C to 6B, and
the xx26 222 arrival on platform 6A to 6A again.

If I'm honest I am slightly disappointed that you've got the likes of the Matlock train still using a through platform for example. I'm most upset that they still feel the need to ECS shunt when in theory you should have less reason to now. This still feels too much like the old pattern and I hope in time that timings will change and capacity will get better as the new system beds in. Otherwise if this is how it will look long term it's quite upsetting really, with trains still cutting across two/three lines at the entrance to get to a platform.

Timetable changes will probably when major things like that are done.
 

gnolife

Established Member
Joined
4 Nov 2010
Messages
2,044
Location
Johnstone
Running through OTT for a Thursday in September, further on from my post above this is what the off-peak looks like:

1A xx01-xx15 Leeds term
1B xx53-xx18 Matlock term
1C xx30-xx34 Norwich thru
2 xx23-xx45 Skegness term
3A xx44-xx55 RHL term
4 xx14-xx17 Lincoln thru
also xx36-xx45 LLS thru
5A xx19-xx25 RHL term
5B xx05-xx37 Birmingham XC term
7 xx59-xx28 London fast term
also xx31-xx32 Leicester stop thru

Unfortunately it appears that the two ECS shunts to Eastcroft will continue:
the xx3x XC arrival on 1C or 3C to 6B, and
the xx26 222 arrival on platform 6A to 6A again.

If I'm honest I am slightly disappointed that you've got the likes of the Matlock train still using a through platform for example. I'm most upset that they still feel the need to ECS shunt when in theory you should have less reason to now. This still feels too much like the old pattern and I hope in time that timings will change and capacity will get better as the new system beds in. Otherwise if this is how it will look long term it's quite upsetting really, with trains still cutting across two/three lines at the entrance to get to a platform.

Arrivals at Nottingham from Rhyl and Llanishen? :o
 

RichmondCommu

Established Member
Joined
23 Feb 2010
Messages
6,906
Location
Richmond, London
Running through OTT for a Thursday in September, further on from my post above this is what the off-peak looks like:

1A xx01-xx15 Leeds term
1B xx53-xx18 Matlock term
1C xx30-xx34 Norwich thru
2 xx23-xx45 Skegness term
3A xx44-xx55 RHL term
4 xx14-xx17 Lincoln thru
also xx36-xx45 LLS thru
5A xx19-xx25 RHL term
5B xx05-xx37 Birmingham XC term
7 xx59-xx28 London fast term
also xx31-xx32 Leicester stop thru

Unfortunately it appears that the two ECS shunts to Eastcroft will continue:
the xx3x XC arrival on 1C or 3C to 6B, and
the xx26 222 arrival on platform 6A to 6A again.

If I'm honest I am slightly disappointed that you've got the likes of the Matlock train still using a through platform for example. I'm most upset that they still feel the need to ECS shunt when in theory you should have less reason to now. This still feels too much like the old pattern and I hope in time that timings will change and capacity will get better as the new system beds in. Otherwise if this is how it will look long term it's quite upsetting really, with trains still cutting across two/three lines at the entrance to get to a platform.

This upsets you? One can only assume that you don't have children!
 

tom1649

Member
Joined
5 Jul 2010
Messages
975
Well it looks like there's going to be a phased introduction of services on Monday morning. I'm in the interesting position of having to catch the 06.00 Sheffield - Nottingham (Northern Rail) on Monday which is listed as running. Let's hope this is actually the case.
 

telstarbox

Established Member
Joined
23 Jul 2010
Messages
6,131
Location
Wennington Crossovers
BBC News have a story on the completion of the work:
http://www.bbc.co.uk/news/uk-england-nottinghamshire-23809658

Network Rail is running test trains into Nottingham Station at the weekend to monitor new signals and other equipment installed as part of a £100m upgrade.

The railway station has been closed to most services for the past five weeks during the work.

Network Rail said the station will reopen as planned on Monday.

Six miles (9.7km) of track, 143 signals and an extra platform were fitted by 750 workers during the project.
 
Joined
11 Sep 2012
Messages
748
Location
uk
Anyone know exactly WHAT is running Monday morning out of Nottingham?
I was going to pick up the 0605 Nottingham to Worksop at Bulwell but now find no trains until 0825.
Lincoln isn't starting til after 8am, Grantham til after 0630. Sheffield is normal.

National Rail shows some cancellations early due to engineering works but doesn't show any alterations due to engineering on the Robin Hood Line. Anyone know what is going on?

Thanks

Mitch
 

tom1649

Member
Joined
5 Jul 2010
Messages
975
Anyone know exactly WHAT is running Monday morning out of Nottingham?
I was going to pick up the 0605 Nottingham to Worksop at Bulwell but now find no trains until 0825.
Lincoln isn't starting til after 8am, Grantham til after 0630. Sheffield is normal.

National Rail shows some cancellations early due to engineering works but doesn't show any alterations due to engineering on the Robin Hood Line. Anyone know what is going on?

Thanks

Mitch

Hi Mitch, this link should help you:
http://www.eastmidlandstrains.co.uk/Global/Eng Summary for Web Wk21 and 22.pdf

This doesn't cover CrossCountry or Northern services though.

CalderRail said:
Monday is august bank hol, so I assume it's Sunday timetable?

No it's a normal Monday service on the railways, with a few exceptions.
 
Last edited:

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Anyone know exactly WHAT is running Monday morning out of Nottingham?
I was going to pick up the 0605 Nottingham to Worksop at Bulwell but now find no trains until 0825.
Lincoln isn't starting til after 8am, Grantham til after 0630. Sheffield is normal.

National Rail shows some cancellations early due to engineering works but doesn't show any alterations due to engineering on the Robin Hood Line. Anyone know what is going on?

Thanks

Mitch
Suggest you have a look at realtimetrains website
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
You asked for what is running. Agreed it does'nt say why if not running but any variations tomorrow could be a combination of start up after Engineering Work and Bank Holiday variations. Bank Holiday would be a normal service, although with some reductions perhaps, but not a Sunday service.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
17,917
Location
East Anglia
East Midlands have tweeted that the first train to London Stp left 'on time'.

Welcome back Nottingham :)
 
Joined
11 Sep 2012
Messages
748
Location
uk
You asked for what is running. Agreed it does'nt say why if not running but any variations tomorrow could be a combination of start up after Engineering Work and Bank Holiday variations. Bank Holiday would be a normal service, although with some reductions perhaps, but not a Sunday service.

No offence meant but I was after a simple list rather than having to hunt through arrivals/departures.
Network Rail have a list of early morning cancellations on their engineering works page but with no mention of the Lincoln & Robin Hood Lines. The info is on the EMT website (if you know where to look) and has obviously been missed from Network Rail. I would have thought that the Network Rail site should have had a complete list as the national authoriy!
Aren't normal Bank Holiday non runners usually shown with a BHX code in the timetable!
 

LTJ87

Member
Joined
1 Jun 2008
Messages
152
I travelled from London to Nottingham today and everything seemed to be running smoothly (and no being held outside!). The main physical change I noticed was what is now platform 7 (formerly 6) and the construction of a new canopy for the platform.
 

Zoidberg

Established Member
Joined
27 Aug 2010
Messages
1,270
Location
West Midlands
Coincidence or related to the recent work?

From http://www.nationalrail.co.uk/service_disruptions/57016.aspx

Incident created 26/08/2013 18:27
Last updated 26/08/2013 18:29
Route affected All routes to, from and through Nottingham

A problem with lineside equipment is causing disruption near Nottingham.

Because of this, there are delays of up to 25 minutes on journeys to, from and through the station. There is no current estimate for when a normal service will resume.
 

brianthegiant

Member
Joined
12 May 2010
Messages
588
bit of a cock up with the 9.02 ex Nottingham which didn't stop at Beeston this morning (bank hol mon), but whizzed past at 9.07 (normally departs 9.08). the narrative being given to punters was to blame the driver. But maybe there's more to it..
 

Yew

Established Member
Joined
12 Mar 2011
Messages
6,880
Location
UK
Perhaps a period spent on The Station Code quiz on the quizzes and games forum thread may be of use here ?

I think the OP was using RHL as an abbreviation for Robin Hood Line. But on the other hand, maybe he has had a premonition about some new services :D
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,893
bit of a cock up with the 9.02 ex Nottingham which didn't stop at Beeston this morning (bank hol mon), but whizzed past at 9.07 (normally departs 9.08). the narrative being given to punters was to blame the driver. But maybe there's more to it..
Maybe, but I reckon that's one thing that we definitely can't blame on the resignalling!
 

Skymonster

Established Member
Joined
7 Feb 2012
Messages
1,994
A freight train has derailed near Carlton.
Because of this, buses are replacing trains between Nottingham and Lincoln Central. Journey times may be extended by up to 60 minutes. There is no current estimate for when a normal service will resume.
Twitter hashtag: #Carlton
Alternative routes where tickets will be accepted
Passengers may use:
East Coast services between Newark and Grantham
Northern Rail services between Lincoln Central and Sheffield


It is estimated that up to a miles worth of track has been damaged due to this incident and that it will take approximately 5 days to repair. A temporary timetable is being arranged at present. Once we have details of this we will publish the information.

Oh dear... Not a good restart to services east of Nottingham
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
31,167
Location
Fenny Stratford
would that be the Nottingham upgrade works that were handed back on time? That will have been a great shame for some posters.............
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,110
would that be the Nottingham upgrade works that were handed back on time? That will have been a great shame for some posters.............

Well the media have a story about useless railways now anyway, i am sure they will link it to the recent work.
 