The ECML would probably benefit from selective ETRMS on sections that could be 125+ mph with it, than tilt on the slower bits. Although 125+ running cold benifit from tilt to increase the availability.
Maybe we could go for a 150mph tilting train. Maybe bombardier could make a voyager/apt hybrid?
Maybe we could go for a 150mph tilting train. Maybe bombardier could make a voyager/apt hybrid?