Not tunnel diameters, track separation, structural live loads?AIUI, the 400km/h is pretty much only preserved in the straightness of the alignment (the thing that's most difficult to change ever again) and not much else. Which, if anything, helps cost by making the alignment straighter (thus shorter and less construction). So the amount of actual extra cost it is driving is probably not very much.
Certainly there's been a lot of work done on track-ground vibration behaviour in areas where the route passes over high-plasticity clay soils. They have quite low shear wave velocities which means an enormous amount of ground improvement or replacement to stop the 'mach cone' effect.