Wires down at Retford today. Haven't heard of any third rail being displaced recently.
Care to show me which stretch of 3rd rail is passed for 125mph running?
And since you seem to believe 3rd rail is a good idea, would you care to tell where else you think it's acceptable to have an uninsulated high voltage live electricity supply running across the ground? I assume you don't have exposed mains circuit cables running across the floor of your lounge ?
--- old post above --- --- new post below ---
I was responding to post 108 where it was said it takes 60 mins to ensure the third rail is off. I was not advocating possessions take place with the third rail live. I suggested it could be possible to manage this 1 hour down. Why one hour to turn off the third rail & confirm it's off? Bridging between sections could be eliminated with short circuit bars,or that is how I am told it used to be done.
I'm going to hazard a guess that all of those have been looked at, but are either unsuitable or susceptible to failure which isn't acceptable. I'm sure Bald Rick will be able to confirm.