Useful update at a recent TfN meeting: https://democracy.transportforthenorth.com/documents/s10675/Transpennine Route Upgrade TFN Summer 25.pdf

It includes this slide showing the proposed service:TRU and wider planned investments will deliver significant timetable enhancements:
• Six fast/semi-fast services between Manchester and Leeds
• Improved links to/from Manchester Airport, Newcastle and Hull
• Two local stopping trains per hour between Leeds – Huddersfield (all day) and Manchester –
Huddersfield (primarily in the peaks) to be operated by NTL
• Substantial improvement in hourly capacity available by spreading demand across fast/semi-
fast/local services
• Assumption is that new trains will be deployed from 2029-30 on routes to Saltburn, Scarborough