There are also connections from each Coastway onto London trains to considerIt only matters if you actually timetable trains with that 4 min connection with the new west coastway timetable in June Im not sure thats the case.
Of course what we really need is a low level Brighton Coastway station deconflicting the service with mainline services and allowing a through Southampton to Hastings service.