ScotRail have also failed to upgrade the WSP. It was part of the original plan but was de-scoped.
That's interesting, I don't recall reading that it was part of the ScotRail plan.
Pity, the sets were really struggling over the HML the other week despite the reduced weight over an LNER set, and I know the LNER sets did lose time in poor conditions - but they got there.
I only remember once travelling on the Chieftain with it arriving in Edinburgh too late to form the 1130 to London due to poor rail conditions over the HML.
I think that says something.