Coxster said:
You not using Jon's trackwork anymore?
What I meant was he is only sharing the Southampton to Basingstoke section at the moment - he has other plans I believe. Also what I meant was you couldn't actually stop him making the same route - no laws against this. I'm not saying this to have a go at you - just so people know the truth. Better versions of things have been kept private because the author doesn't think he is allowed to re-create something. Same as if you release the E-Rail CEP, Making Tracks have made a CEP so you are duplicating their work etc. Neither Dave is using your actual trackwork, nor is E-Rail actually using the CEP model by MT.
I see where your coming from, but that's not what I meant. What I meant was that rather than Dave producing the route behind the scenes, and then releasing it without telling me about it, it would be considered rather rude. Dave being the nice bloke that he is, kindly informed me that he was planning to build the route. As you said, I couldn't stop him, very true, but I wouldn't have done anyway because I'm not a stingy git.
My point is that a certain element of courtesy and politeness came into it, Dave took the courtesy to inform me that he was going to Waterloo (pics on UKTS btw if you haven't seen.
), and I returned it by saying I had no problem with it, that's all there is to it.
Coxster said:
Jonno2055 said:
I have noticed though that E-rail and Europeanbahn are both planning to do the GWML Paddington to Bristol.
I know which one I'll be buying.
Well at this stage it is likely that you will be buying the EB version for MSTS, as we are thinking that our L2B will be for KRS, but we're not sure yet. We are still in deep discussion about the matter.
--- edited ---
Rich said:
I dont really use MSTS as I think BVE4 is for better train wise. I think scenery is better in MSTS, as it looks more realistic. However, trains are not as good, as they dont have all the additional features which BVE4 ones have (wipers, rain, AWS, TPWS, engine start up/stop etc). However these screenshots look excellent. I am intrigued to know which route they came from? If they are from your website trains2, I'll download it and give it a try (but if it is from UKTS, I'll give it a miss...)
As Damon says, it is WIP at the moment, and it likely to be payware for MSTS. Don't ask when though as we simply don't know. I can tell you though that we are about 5 miles out of Waterloo track wise.