Thameslink/ Class 700 Progress

Status
Not open for further replies.

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
No problem, if I contacted you directly would you be able to check a couple of trains? I just want to make sure they are 8/12 cars and not 4. As TL have done this in the past and it is a pain.

I'm back now after some time away so I may be able to assist.

As for train length, there's a mix of 4, 8 and 12 car services on Thameslink. Booked to be that way on standard weekend days.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

neilm

Member
Joined
3 Jan 2012
Messages
499
I'm back now after some time away so I may be able to assist.

As for train length, there's a mix of 4, 8 and 12 car services on Thameslink. Booked to be that way on standard weekend days.
Could you confirm the 07:31 from BTN and the 18:12 and 18:42 from LBG?

Thanks!
 

Class455

Established Member
Joined
19 May 2016
Messages
1,458
Apologies if I've missed any posts about this but today, diagram TB501, booked for a 700/1 is being worked by 377 143, 377 461 and 377 450 which I'm currently on! An earlier TL service from Brighton to London Bridge was terminated at East croydon and was worked by 377 160, 377 103 and 377 146! This was a shame as I was expecting and waiting for a 700. Any reason why Southern units are being loaned for these services today?
 
Last edited:

Class 466

Established Member
Joined
5 Mar 2010
Messages
1,800
Location
Atherton, UK
Apologies if I've missed any posts about this but today, diagram TB501, booked for a 700/1 is being worked by 377 143, 377 461 and 377 450 which I'm currently on! An earlier TL service from Brighton to London Bridge was terminated at East croydon and was worked by 377 160, 377 103 and 377 146! This was a shame as I was expecting and waiting for a 700. Any reason why Southern units are being loaned for these services today?

It's a revised Saturday service today, not SX.
 

Class 466

Established Member
Joined
5 Mar 2010
Messages
1,800
Location
Atherton, UK
So is the loaning of Southern 377's on Thameslink services a regular occurrence then every Saturday or is it just throughout the Christmas period?

That's a Daily occurrence. Most LBG-BTN services are SN 377s except for the weekday ones covered by TB501
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Could you confirm the 07:31 from BTN and the 18:12 and 18:42 from LBG?

Thanks!

Sorry for the delay, been busy so didn't see your question until now.

For the record the services are booked to be...

07.31 BTN - LBG 8 car 377

18.12 LBG - BTN 12 car 377

18.42 LBG - BTN 8 car 377

All are booked Southern units

Any news on when they'll be using Class 700s to and from Peterborough?

Later in 2017. GN testing is still o going at present (and slightly ahead of when it's needed). Currently efforts are to replace all TL services with class 700s prior to the 700s going onto other routes. However by end of 2017 the 700s will have spread further.

Is the plan also to run them up to Cambridge North on opening too?

GTR are proposing the Brighton to Cambridge service runs to Cambridge North on its 2tph frequency.

I've just worked that out when trying to track down more 700s on the Catford Loop.

This week (weekday) all services from Orpington and Sevenoaks are 319s.
 

TheDavibob

Member
Joined
10 Oct 2016
Messages
422
GTR are proposing the Brighton to Cambridge service runs to Cambridge North on its 2tph frequency.

I'm aware of the eventual plan, I was just wondering if the interim plan was known (before they run through the core), given the year's gap between Cambridge North opening and the Canal Tunnels being put into use.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
I'm aware of the eventual plan, I was just wondering if the interim plan was known (before they run through the core), given the year's gap between Cambridge North opening and the Canal Tunnels being put into use.

The 700s will start running on Cambridge services during 2017 and if/when they are extended to Cambridge North the 700s will run there. They will be running to Cambridge North prior to the Canal Tunnels accepting passenger traffic (Tunnels are already open).

Plan is for the 700s to be used on further routes replacing stock prior to linking to Thameslink. An example of this will be 700s booked to run from Kings Cross to Cambridge and Peterborough in 2017 on same services than exist now.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,317
Location
Central Belt
I'm aware of the eventual plan, I was just wondering if the interim plan was known (before they run through the core), given the year's gap between Cambridge North opening and the Canal Tunnels being put into use.

How long will it take to get to Cambridge north? Considering the x04 and x52 kings cross services have at least 25 mins at Cambridge, would this be enough to absorb into the existing diagrams with the risk that the service will be turned at Cambridge during late running.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
18,856
Location
Hertfordshire / Teesdale
How long will it take to get to Cambridge north? Considering the x04 and x52 kings cross services have at least 25 mins at Cambridge, would this be enough to absorb into the existing diagrams with the risk that the service will be turned at Cambridge during late running.

I hope turnround times at Cambridge North will be generous. Over time turnround times at Peterborough have reduced on many services for various reasons, and it's very evident how this impacts on punctuality. By contrast the XX30 Cambridge to London trains tend to be fairly punctual.
 

Crun

Member
Joined
30 Dec 2014
Messages
697
Location
Werrington, Peterborough, England
Sorry for the delay, been busy so didn't see your question until now.

For the record the services are booked to be...

07.31 BTN - LBG 8 car 377

18.12 LBG - BTN 12 car 377

18.42 LBG - BTN 8 car 377

All are booked Southern units



Later in 2017. GN testing is still o going at present (and slightly ahead of when it's needed). Currently efforts are to replace all TL services with class 700s prior to the 700s going onto other routes. However by end of 2017 the 700s will have spread further.



GTR are proposing the Brighton to Cambridge service runs to Cambridge North on its 2tph frequency.



This week (weekday) all services from Orpington and Sevenoaks are 319s.

Thanks for all the updates.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
29,522
Location
UK
I assume he drives (or is driven) or else how the heck does he get to work on time?
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
29,522
Location
UK
GTR's HQ is in London, so perhaps he uses the Tube or another TOC...
I know that one MD of FCC had a second property (a small flat, next door to a friend) that was walking distance to Hertford House, Old Street. If raining, a few stops on the 55.

But it does now make me wonder how the head honcho and indeed other management, plus ordinary office staff for GTR, get to work and home.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
I know that one MD of FCC had a second property (a small flat, next door to a friend) that was walking distance to Hertford House, Old Street. If raining, a few stops on the 55.

But it does now make me wonder how the head honcho and indeed other management, plus ordinary office staff for GTR, get to work and home.

Large proportion use the rail system.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
As I suspected, so a lot must be just as p***ed off as everyone else. At least they don't have to use Delay Repay though.

Or maybe they do, for accounting purposes!

Not allowed to do delay repay but are expected to get to work on time no matter what.
 

ComUtoR

On Moderation
Joined
13 Dec 2013
Messages
9,571
Location
UK
GTR's HQ is in London, so perhaps he uses the Tube or another TOC...

When he worked for us. He cycled.

How to GTR expect their workers to be there on time if they're taking GTR's service!

It's our responsibility to get to work. I would say that part of the reason why we have such rules as being close to your depot ensures that we get to work on time.
 