tsr
Established Member
As many of you are well aware, what a train is listed on RTT "timed for", the stock used and the maximum speed attained are all different things. But the following VSTP schedule for 2A04 0102 Ldn Victoria-Brighton caught my eye on Realtime Trains tonight: http://www.realtimetrains.co.uk/train/W88640/2015/08/09/advanced
As you can see, it is timed for the absurd figure of 224mph. Has anyone seen higher, and does anyone know if this is the theoretical maximum able to be entered into the various systems or not? It is pretty blatantly an error but seems like a more interesting one.
(The reason for the VSTP schedule is that there is an additional possession between Redhill and Stoats Nest Jn tonight.)
As you can see, it is timed for the absurd figure of 224mph. Has anyone seen higher, and does anyone know if this is the theoretical maximum able to be entered into the various systems or not? It is pretty blatantly an error but seems like a more interesting one.
(The reason for the VSTP schedule is that there is an additional possession between Redhill and Stoats Nest Jn tonight.)