This week’s infrastructure problems
As you’ll be aware we’ve had two days of catastrophic infrastructure failure in the Thames Valley, principally around the Hayes - Airport Junction area. This has massively impacted on our evening peaks on Wednesday and Thursday evenings, delaying and frustrating our customers across our network. It has also put huge strain on colleagues in GWR and in Network Rail.
The failure is a repeat one, based upon information between the points giving detection, i.e. if they are fully pointing in the right direction, and therefore how the signalling can work. This information all must be present for signallers in the Thames Valley Signalling Centre to signal trains.
For two nights running, as we’ve gone into the evening peak, as the air temperature has gone up and we’ve lost all the track circuits and detection on all the points in that area due to a problem with data transmission. Without that detection, the Signallers can’t signal trains and move them. The Signallers need confirmation that the points are in position. To do that they are ‘clipped’ or clamped and a process called Temporary Block Working (TBW) put in place. TBW effectively gets a reduced number of trains through a section. So when it goes in, we know the timetable plan isn’t going to work.
Over the last two nights this TBW process has gone badly and been too slow to implement. This has meant huge delays and confusion and ultimately the distressing scenes that we’ve witnessed.
I’ve been speaking to the Chief Operating Officer for Network Rail Western, Route Gareth Vest, who is committed to improving the situation and offers a full apology. As someone who has worked for a train operator, he knows the impact this has on people and how they react. He has put a huge amount of resource together to get this right.
Fundamentally NR have an issue around understanding the technical failure and as a result have brought in additional tech support from the manufacturers of the signalling equipment (Siemens and Alstom). I am in regular contact with Gareth and his team to ensure they get to the bottom of the failure and the mitigation for the failure.
In order to protect ourselves this evening, we have a number of points ‘clipped’ already, whilst the NR team watch data streams from the point work (transmitted to the TVSC that tell them they are working). They have local teams watching and patrolling the area in case of a repeat failure.
I can’t promise that we won’t have any issues this evening but I can say that at all levels of Great Western and First Group, we are working with Network Rail to ensure they get this right.
I want to thank all of you on behalf of the Exec Team for your effort and professional conduct throughout a really tough couple of days. I am always amazed by what GWR can do in a crisis, from manning stations, to crew resourcing through to the energy and robustness of our Control and everything in between.