I stumbled upon this document thanks to a post on the Brigg Line Blog. So it appears that Northern have started up a round of consultations with stakeholders about their December 2017 timetable change. It makes for very interesting reading and on the whole I think it's probably a good thing as a stepping stone to further changes.
Harrogate possibly being the biggest winner and Bishop Auckland doing quite well from it also.
The document can be found at this link (with an interesting choice of host )
Harrogate possibly being the biggest winner and Bishop Auckland doing quite well from it also.
The document can be found at this link (with an interesting choice of host )