Great Western Electrification Progress

Status
Not open for further replies.

Mintona

Established Member
Joined
8 Jan 2006
Messages
3,592
Location
South West
Just a small update, the overhead wires on the Up and Down Tunnel lines between Stoke Gifford Junction (Bristol Parkway) and Patchway Junction are being energised from 0220 on Sunday 12th May.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Linda.smith

Member
Joined
6 Nov 2018
Messages
23
Work in progress at Severn tunnel station yesterday

57534122_10217238770214651_3534893620890959872_n.jpg
57325135_10217238770414656_8863487372684165120_n.jpg
57308920_10217238769934644_7715753557210693632_n.jpg
57289469_10217238768734614_8782268733662953472_n.jpg
 

Dren Ahmeti

Member
Joined
17 Oct 2017
Messages
550
Location
Bristol
First public electric train ran on the Chippenham to Wootton Bassett section of electrification today.
First train was 1A07, the 0749 Bristol Temple Meads to Paddington.

D4qSn8gWwAAgfAq

Photo is said train climbing Dauntsey Bank, at Christian Malford.

Thank you to Garry - @25Kv on Twitter - for the heads-up.
 
Last edited:

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
10,035
Location
here to eternity
First public electric train ran on the Chippenham to Wootton Bassett section of electrification today.
First train was 1A07, the 0749 Bristol Temple Meads to Paddington.

D4qSn8gWwAAgfAq

Photo is said train climbing Dauntsey Bank, at Christian Malford.

Thank you to Gary - @25Kv on Twitter - for the heads-up.

Good news!
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,355
Is it really that big a difference in cost and complexity?

Signals have to be spaced braking distance from the first cautionary aspect to the red - so in 4 aspect territory the signal spacing is halved so you need twice as many signals.
 

Dren Ahmeti

Member
Joined
17 Oct 2017
Messages
550
Location
Bristol
@25Kv:
Acceleration chart on Electric.
“First time on electric up Dauntsey Bank... 120mph at the top of the bank, comfortably doing 125 before we hit Wootton Bassett.
D4rWj0PWkAAEmiU


And diesel for comparison:
D4rXh5jWsAAytzV

“Here is a trace from last week, same trip on diesel. Max speed 99mph Remember, acceleration = capacity”

PS: Sorry to mods/viewers about format, currently on mobile as I’m on holiday in the Netherlands!
 

Pete_uk

Established Member
Joined
28 Jan 2017
Messages
1,253
Location
Stroud, Glos
The dust seems to have settled somewhat on this project and it's just bumbling along in it's own sweet way now.
 

Brissle Girl

Established Member
Joined
17 Jul 2018
Messages
2,671
Well only the South Wales stretch to go now and that’s a fair way through, so not so much bumbling as nearing the finishing post.
 

Thunderer

Member
Joined
29 Nov 2013
Messages
430
Location
South Wales
How far west from Severn Tunnel Jcn (Towards Newport) is planned to be wired by the end of today (Easter Monday)? Are thry going to wire as far as Newport station in this period of possession?
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,498
Location
Between Peterborough & Bedlington
How far west from Severn Tunnel Jcn (Towards Newport) is planned to be wired by the end of today (Easter Monday)? Are thry going to wire as far as Newport station in this period of possession?
There's at least 1 boom still missing over the Usk bridge (on the western side) - that was the state of play on Easter Saturday (the 20th). There is of course next weekend's possession too...
 

Thunderer

Member
Joined
29 Nov 2013
Messages
430
Location
South Wales
There's at least 1 boom still missing over the Usk bridge (on the western side) - that was the state of play on Easter Saturday (the 20th). There is of course next weekend's possession too...
Excellent, many thanks for the update. I'll be riding along the line tomorrow from South Wales to Bristol, so hopefully I'll be able to take a good look at the progress. I guess by the back end of summer, the project will be more or less complete to Cardiff?
 

Linda.smith

Member
Joined
6 Nov 2018
Messages
23
I had a look yesterday, and all 4 lanes seemed to be close to completion west of Severn tunnel station, thou i suspect that this ends at, or around the point where the lines go under the M4 motorway. At undy, there is still a short gap where piling was competed friday, and is the same in Magor. Yesterday, they were busy laying trackside trunking through to magor bridge.

As far as Newport is concerned, this posession was only a partial one, as the coil trains from Port talbot to Llanwern, and passenger services to Hollyhead have still been running through Newport station. In saying that, they have only been using the up main & not the down relief. East of Newport station, there was (yesterday) only 3 booms to lift between the station and the eastern side of the usk bridge. From that point on towards Somerton bridge (where the last gap begins) a lot of masts, booms & portals have been put in place over the past few weeks, and a lot of piling has been done. This includes some of the tensorex type between the Careleon and Maindee bridges, and one that is visable to the east of Maindee bridge.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,450
Hopefully they'll be electrified too - albeit in this control period. Henley & Windsor should be simple enough - Marlow is still a nightmare.
Marlow was specifically removed from the specification, unlike the other deferred branches, so it’s no longer really a ‘nightmare’...
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,498
Location
Between Peterborough & Bedlington
Marlow was specifically removed from the specification, unlike the other deferred branches, so it’s no longer really a ‘nightmare’...
In relation to the spec, it was indeed a nightmare (due to the Bourne End layout), so that's why it was removed.
You are correct with regard to it no longer being a nightmare in the current programme though!
 